Bid document
Updated
A PDF document (5 KB) attached to MJU-76/B Flare, Countermeasure, from the Department of the Air Force. Due Oct 30, 2026, 2:00 PM (UTC-6).
File name: GFPFA821326RB005_1.pdf
The full file is for paid members, or buy this bid alone.
Preview
GFP Attachment
Status: Recalled and Re-Initiated via Web
GFP Attachment Information:
Attachment Type
Solicitation
Attachment Number
Attachment Date
2026-03-30
Solicitation Information:
Solicitation Number
FA821326RB005
Program Title
MJU-76/B
Comments
Provisioned Item(s):
Provisioned Item - Line Number: 0001
Item Name
Item
NSN
CAGE Code
Part Number Model
Description
Number
BBU-35A/B
Impulse
137701642157
Cartridge used 4
to ignite the
MJU-76/B
Serially Managed?
Property
Property Usage
Property System ID
Classification
No
Test
Consume
Quantity
Unit Of Measure Unit Acquisition Use As-Is
Upgradable?
Cost
2500
Each
true
No
Delivery Date
Duration
Time Unit
Delivery Event
Months
Award Date
Notes
We expect the vendors to use ~ 2,500 BBU-35's for use in testing with the MJU-76/B
Provisioned Item - Line Number: 0002
Item Name
Item
NSN
CAGE Code
Part Number Model
Description
Number
CCU-145
Cartridge used 137701481201
for ignition of
the MJU-76/B
Serially Managed?
Property
Property Usage
Property System ID
Classification
No
Test
Consume
Quantity
Unit Of Measure Unit Acquisition Use As-Is
Upgradable?
Cost
2500
Each
true
No
Delivery Date
Duration
Time Unit
Delivery Event
Months
Award Date
Notes
CCU-145's are going to be used over the life of the MJU-76/B contract for LAT and FAT testing Provisioned Item - Line Number: 0003
Item Name
Item
NSN
CAGE Code
Part Number Model
Description
Number
Steel Pallets
Steel pallets
399000039022
are a
requirement
from the USN
for storing
flares on Navy
vessels. This
pallets are
made of steel
as opposed to
normal wooden
pallets.
Serially Managed?
Property
Property Usage
Property System ID
Classification
No
Storage
Quantity
Unit Of Measure Unit Acquisition Use As-Is
Upgradable?
Cost
Each
true
No
Delivery Date
Duration
Time Unit
Delivery Event
Months
Award Date
Notes
steel pallets are a requirement from the USN. We use these as opposed to normal wooden pallets.
Requisitioned Item(s):
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: Air Specv4
- Attachment 12
- Attachment 13: AFMC 260 FAT
- Attachment 16: Contract Data Requirements List
- Attachment 19: JQR
- Attachment 2: WARP
- Attachment 23: PHST Statement of Work HILL 2023
- Attachment 3: ES7035 Description Sheets
- Attachment 4: ES6200
- Attachment 5: ES7034 (Rework Repair)
- Attachment 7: REPSHIP
- Attachment 8: TransInstruction4