Bid document
Updated
A Word document (20 KB) attached to 657A5-24-108, FCA Replace Medium Voltage Feeder 3 and Transformers l MC FY27 NRM VISN Base DE, from the Department of Veterans Affairs. Due Nov 17, 2026, 12:00 PM (UTC-6).
File name: 36C25527R0013_2.docx
The full file is for paid members, or buy this bid alone.
Preview
SUBJECT*
657A5-24-108, FCA Replace Medium Voltage Feeder 3 and Transformers l MC FY27 NRM VISN Base DE
GENERAL INFORMATION
CONTRACTING OFFICE’S ZIP CODE*
66048
SOLICITATION NUMBER*
36C25527R0013
BASE NOTICE TYPE
RESPONSE DATE/TIME/ZONE
11-17-2026 12:00 PM CENTRAL TIME, CHICAGO, USA
ARCHIVE
90 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
C222
NAICS CODE*
541330
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs
Network Contracting Office (NCO) 15
3450 S 4th Street Trafficway
Leavenworth KS 66048
POINT OF CONTACT*
Contracting Officer
Maria Hoover
[email protected]
913-946-1130
PLACE OF PERFORMANCE
ADDRESS
Marion VA Medical Center
2401 West Main Street
Marion Illinois
POSTAL CODE
62959-1188
COUNTRY
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
office email
DESCRIPTION
Modification 2 to Presolicitation Notice 36C25527R0013
This modification provides answers to RFIs received and revised the evaluation criteria to be used for this project. RFIs Received for Project # 657A5-24-108, Replace Medium Voltage Feeder 3 and Transformers 1. Factor 4 – Past Performance / Section F Project Eligibility The solicitation states that projects submitted for past performance consideration must have completed both design and construction, and that projects not constructed will not be considered. Would the VA consider accepting relevant electrical infrastructure studies or assessments in Section F, particularly those involving medium-voltage distribution systems and feeder evaluations, that demonstrate directly applicable technical expertise but did not result in construction? We prefer to keep it as projects that were designed AND constructed. Since this is a construction project and not a study, we want projects that have been finished to be used for past performance criteria. 2. Factor 2 – Specialized Experience and Technical Competence / Laboratory Requirements Factor 2 references the firm's technical capabilities in design quality management procedures, CADD/BIM, equipment resources, and laboratory requirements. Given that the project scope primarily involves medium-voltage electrical feeder and transformer replacements, could the VA clarify the applicability of laboratory requirements to this project? We respectfully request that this criterion be removed from the evaluation requirements, as it does not appear directly relevant to the stated scope of work. Laboratory requirements were deleted. Please see revised evaluation criteria below.
The beginning of the document. Download the full file to read on.