JFSD260019 - Replace Flooring Basic Contract (IDIQ)
Bid Schedule Instructions
21 September 2026
1. GENERAL/OBJECTIVE:
This document is to identify multiple year contracting costs for select flooring materials, labor, and other flooring related activities. This pricing is to be used on individual task orders, to be executed over five years, with a possible six-month extension at the government’s prerogative. The specific requirements are included in the attached Technical Provisions. The work to be performed under this contract will typically include flooring-related activities and requirements as outlined in the attached Technical Provisions.
2. BID SCHEDULE:
2.1. (General) Contractor bids are to be submitted using the attached line-item bid schedule. 2.2. (General) The general bid schedule includes some pre-entered formulas that provide sums for material costs, annual costs, and total project costs. However, this is an active Excel file, subject to errors and data entries outside of government control. The bidder is solely responsible for the data entered, cost projections, excel formulas, and the totals within the bid schedule. 2.3. (Bidding, General) Provide a line-item bid for each item listed on the bid schedule provided. These bids are to establish the annual cost, for each item, to be used on future flooring focused task orders. Each heading in this schedule is intended to reinforce the total costs to be associated with these individual line-items.
2.4. (Mark-ups, General) Each line-item shall include contractor mark-ups. This includes all supervision, management, vehicle mileage, transportation, subcontractor costs, bonds, and overhead & profit. Each category heading on the bid schedule reinforces the elements to be included in the line-item costs.
2.5. (Bidding, Carpet / Glue Material) Carpet and adhesive material prices set by the Carpet Program. See the Technical Provisions for additional information on the Carpet Program. For bidding purposes, enter the first year not-to-exceed (NTE) price of the contractor’s selected carpet material from the Carpet Program. For years two through five apply 8% escalation to the previous year’s price.
2.6. (Mark-ups, Carpet Material) For Items BA to BG on the bid schedule, cells are included for Year One where the contractor will input their material cost mark-up. For these materials, the Contractor is required to bid the mark-up they will apply onto the NTE material cost from the Enterprise Contract. Enter the percentage in column titled “Material Mark-Up” on the bid schedule. The Air