Building 111 Phase 1 technical scope schedule
Technical scope update for amendment | 36C24827Q0084 | 10 November 2026 Provide thirteen new card-only reader positions at nine third-floor openings. Preferred readers are Identiv uTrust with terminal-block connections. Provide narrow mullion readers at 3B-149 and 3A-171. All new readers use OSDP with the specified Secure Channel and applicable credential and C-CURE compatibility requirements. Provide two fully equipped thirty-two-reader iSTAR Ultra G2 assemblies, with consolidation authorized. Migrate forty-six existing reader positions and associated required functions and add thirteen new reader positions: fifty-nine active positions and five spare positions across the two assemblies. Door hardware assignments
Opening
New readers
Confirmed hardware
3B-149
Mullion reader, strike, DPS and REX. Complete new hardware package. 3A-171
Mullion reader, strike, DPS and REX. Complete new hardware package. 3B-165
Reader, strike, DPS and REX. Complete new hardware package. 3A-155
Reader, strike, DPS and REX. Complete new hardware package. 3A-107
Reader, strike, DPS and REX.

3B-C3-26 / 3A-C3-25

Reader on each side; electrified handle/lockset and DPS. No REX. 3B nurses station to 3B-C3-19
Reader on each side; strike and DPS. No REX.
3B nurses station to 3B-C3-20
Reader on each side; strike and DPS. No REX.
3A-C3-2A
Reader on each side; strike and DPS. No REX.
Four complete new hardware packages are identified above. REX is required at the five single-reader openings and is not included at the four dual-reader openings. Preserve required independent staff/emergency release and approved ward/egress operation. First-floor SPR-76 and door 1B-178 are excluded.