Statement of Work
C CURE upgrades for Project Lighthouse
Draft for review Revision 3 10 November 2026 36C24827Q0084 Provide two complete 32-reader iSTAR Ultra G2 assemblies, replace all three existing controllers and migrate their 46 existing reader positions, and install 13 new card-only readers at nine openings. The total is 59 active reader positions and five spare positions across 64 fully provisioned positions. Include four complete new-door hardware packages, composite cable and contractor-provided pathways for new work, DPS, and documented ward and life-safety operation. Identiv uTrust with terminal-block connections is the preferred basis of design; compliant APL-listed compatible alternatives remain acceptable. Equip and wire the 13 new readers for future High Assurance (HA) activation, while commissioning them in the existing VA-approved card-only access mode. New-reader certificate authentication, HA enrollment/validation services and HA licensing are outside this phase. Technical requirements and the common door schedule are defined below. This draft is for review and is not an issued solicitation amendment. Contractor verifies actual conditions and submits supported implementation details before ordering. The issued solicitation and written CO amendments establish contractual scope and final priced quantities.

1 Scope quantities and substitutions

R01 Complete integrated scope. Provide all labor, supervision, engineering detailing, materials, delivery, staging, pathways, composite cabling, removal, installation, programming, integration, testing and closeout for Phase 1 on the third floor of Building 111 at C.W. Bill Young VA Medical Center. Install 13 new card-only readers at the nine openings in Attachment 1, including four complete new lock/DPS/REX packages at 3B-149, 3B-165, 3A-171 and 3A-155. Replace all three existing controller assemblies and migrate their 46 existing reader positions and associated functions to two fully provisioned 32-reader iSTAR Ultra G2 assemblies. None of the three legacy controllers shall remain in service as an active, standby or expansion controller. Compatible existing field devices and wiring may remain as specified under R22. Provide 64 positions total, with 59 active and five spare, and integrate with the existing VISN 8 C•CURE system. Future HA readiness for the 13 new readers is defined in R27; live HA activation is not part of this phase. Preserve any established authentication functions on the migrated readers. SPR-76 and first-floor door 1B-178 are excluded.