Chain Link Fence Question and Answers 0001
Updated
A Word document (18 KB) attached to Wv-Canaan VLY Nwr-Chain Link Fence, from the Departmental Offices. Due Oct 27, 2026, 12:00 PM (UTC-4).
File name: 140FF027Q0011_Chain_Link_Fence_Question_and_Answers_0001.docx
The full file is for paid members, or buy this bid alone.
Preview
140FF0276Q0011 Chain Link Fence Question and Answers
Could the Government specify the required outside diameters (O.D.) and pipe schedules (e.g., Schedule 40 vs. SS40) for: a) Terminal/Corner Posts (e.g., 2-7/8" O.D.)?b) Line Posts (e.g., 2-3/8" O.D.)?c) Top Rail (e.g., 1-5/8" O.D.)? A) Terminal/Corner Posts: 2-7/8" O.D. B) Line Posts: 2-3/8" O.D. C) Top Rail: 1-5/8" O.D. Pipe schedules: Schedule 40. What is the minimum required depth and diameter for post concrete footings? Is a 36-inch or 42-inch depth required to meet local winter frost line requirements in Davis, WV? 36 inches Can the Government provide an estimated count of existing posts requiring total replacement versus posts requiring mechanical realignment/straightening? Top rails needing replaced: 10, top rails needing repaired: 2, line post replaced: 2, line post repaired: 2, terminal posts to replace or repair: 0 Is a bottom tension wire (e.g., 7-gauge galvanized coil spring wire) or bottom rail required along the base of the newly installed 350 LF fence? No bottom tension wire Are there any pedestrian swing gates or vehicular equipment gates included in either the 350 LF new installation or the 1,000 LF repair sections? If yes, please provide opening widths and hardware specs. Two swing gates on repair section. Swing gates are 12 ft openings. One gate will need straightened. Will the Government / Refuge staff perform necessary clearing, mowing, and brush trimming along the fence line prior to contractor mobilization, or must the contractor include clearing and grubbing? Yes Will the Government provide reasonable access to on-site water spigots and 120V electrical power at the Maintenance Facility for concrete mixing and tool operation at no cost to the contractor? Water and 120V power are located on site. Is the contractor required to transport all removed metal fence scrap and demolition materials to an off-site disposal/recycling facility, or is on-site scrap disposal permitted at the Refuge Maintenance yard? Yes Has the anticipated winter weather and associated cold-weather construction requirements been considered in establishing the project budget and 45-day completion period? Yes
Would schedule extensions be considered if frozen ground, severe weather, or unsafe conditions prevent proper excavation, concrete placement, or curing? Yes with proper justification of weather and or site conditions.
The solicitation references both a 45-calendar-day completion requirement and a performance period extending through January 6, 2027. Which completion deadline governs? 45 days
The beginning of the document. Download the full file to read on.