P-1550 SOF MARINE RAIDER BATTALION /COMPANY / TEAM FACILITIES

Continuation Sheet for Revisions
June 16, 2026

Drawings
SITE-CD101: Moved portion of fence to proper demolition plan sheets. Removed the demolished fence from site plan.

SITE-CD110: Note added for the coordination of the demolition of existing junction box with installation of telecommunications.

SITE-CS101: Removed small fence stub. Plans revised.

SITE-CS102: 10’ of clear space is now provided on the outside of the fence line.

SITE-CS103: Detail and key note for a taper curb added on sheets.

SITE-CS106: Sidewalk revised to allow room for an ABA gate. Detail added accordingly. Key note added for clarity.

SITE-CS109: Sidewalk revised to allow room for an ABA gate. Detail added accordingly. Key note added for clarity. Fence slightly adjusted to allow for ABA gate. Curb taper added on sheets with key note.

SITE-CS110: Curb taper detail and key note added. Key note #8 revised to show gate length.

SITE-CG100: Building A3 label updated to show FFE.

SITE-CG101: Contours revised. Key notes updated to reflect plan.

SITE-CG102: Spot elevations added to show drainage on south side of road.

SITE-CG103: Spot elevations provided for and around the external loading dock. Positive drainage provided around the dock. Grading slightly revised for security of site, around the gate area.

SITE-CG104: UGC conflict has been addressed. Contour has been updated north side of the road. Curb spot elevations have been updated. Inlet rim elevations have also been revised.

SITE-CG106: Building A3 labeled. A3 FFE labeled as well. Spots elevations in front of building A2-1 have been adjusted. Contours west of the building have been revised as well. Curb and gutter line work has been revised.

SITE-CG113: Building A1 FFE labeled.

SITE-CG116: Buildings A2-1 and A2-2 FFE’s have been labeled. The routing and tie angle has been revised for the 24” and 12” pipes connecting to a junction structure.

SITE-CG119: Buildings A3 and A2-2 FFE’s have been labeled.

SITE-CG147: All buildings on sheet now have FFE provided.

SITE-CG150: Buildings A3 and A2-2 now have FFE provided.

SITE-CG151: Stock pile area has been delineated. Key note added for stock pile area.

SITE-CU152: Stock pile area has been delineated. Key note added for stock pile area.

SITE-CU101:UGC conflicts will be coordinated with telecommunication team, note added.

SITE-CU103: Utility connection locations updated.

SITE-CU104: Utility connection locations updated.

SITE-CU105: Utility connection locations updated.