P1550 PPI RESPONSES 1

Updated

A PDF document (109 KB) attached to Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina, from the Department of the Navy. Due Oct 27, 2026, 2:00 PM (UTC-4).

File name: P1550 PPI RESPONSES 1.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Date
Submitte
d
5/19/2026

Reference
Page Section

00 70 00

5/19/2026

Attachment C Price Schedule

5/19/2026

Attachment C Price Schedule

5/19/2026

Attachment C Price Schedule

Question

Response

The Solicitation
specifically DFARS
252.204-7021 and 7025
note this project requires
CMMC Level 1, which
offeror's would assume the
project does not contain
CUI. However, several
drawings in package A1 BN HQ, specifially the
AY set of drawings have a
CUI label. Please confirm
if these drawings are in
fact CUI and need to be
handled as CUI including
requiring a CMMC Level

2 from the prime contract

as well as subcontractors
that will handle these
documents. Please note
the documents were
publically distrubted on
SAM.gov/PIEE without
any restrictions.
CLIN ITEM 0001 states
"Project P-1550 - SOF
Armory…" please confirm
this was done by mistake,
and a new bid form with
the correct information
will be forthcoming.
CLIN ITEM 0001 states
"includes subtotal of
0001A and 0001B" please
confirm this was done by
mistake, and it should read
includes subtotal of 0001A
through 0001J. If so,
please provide a new bid
form with the correct
information in a
forthcoming Amendment.
Please confirm that all
subtotal costs provided on
line items 0001A through
0001J should be included
in the Total Price for
CLIN 0001 and these
breakouts are for
information only.

File has been removed
from SAM.gov. Further
guidance will be provided
when files are available.

Paragraph

This was a clerical error
and the description has
been corrected. Please see
Amendment 0001 for the
revised form
This was a clerical error
and the description has
been corrected. Please see
Amendment 0001 for the
revised form

Yes, this is correct.

5/19/2026

Pages
9-10

Factor 2

5/19/2026

Page

Price Proposal

5/19/2026

Attachment H Small Business
Subcontracting
Plan

On pages 9-10 of the RFP,
Factor 2 requires a CPM
schedule with no page
limit, as well as a
Summary Schedule
limited to 1 page. Please
clarify that these are 2
separate deliverables
within Factor 2, and that
the page limits are
accurate for each.
If an Offeror files VETS
4212 reports for multiple
hiring regions, please
confirm if all report
confirmations should be
included in the proposal,
or only the report
confirmation that
corresponds to the region