Home / Switch Multiplexer Unit (SMU) Recap & Repair and Circuit… / Document

Contract Data Requirements List A001 QC PLAN SIGNED

Updated

A PDF document (145 KB) attached to Switch Multiplexer Unit (SMU) Recap & Repair and Circuit Card Assembly (CCA) Eval & Repair, from the Department of the Army. Due Oct 30, 2026, 3:00 PM (UTC-4).

File name: 3_CDRL A001 QC PLAN_SIGNED.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Form Approved OMB No. 0704-0188
OMB Approval Expires 20221130

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
0006, 1006, 2006

TDP

D. SYSTEM/ITEM

SWITCH MULTIPLEXER UNITS & CCA's

1. DATA ITEM NO.

C. CATEGORY:

B. EXHIBIT

OTHER QUALITY CONTROL PLAN

TM

E. CONTRACT/PR NO.

F. CONTRACTOR

GENERAL DYNAMICS MISSION SYSTEMS

2. TITLE OF DATA ITEM

3. SUBTITLE

QUALITY

QUALITY CONTROL PLAN

17. PRICE GROUP

A001

NSP

5. CONTRACT REFERENCE

4. AUTHORITY (Data Acquisition Document No.)

SEE BLOCK 16

7. DD 250 REQ

N/A

10. FREQUENCY

A

11. AS OF DATE

8. APP CODE

6. REQUIRING OFFICE

PWS PARA 1.4.1.1

9. DIST STATEMENT

REQUIRED

N/A

DIO

12. DATE OF FIRST SUBMISSION 14.

ONE PRELIMINARY

DISTRIBUTION

SEE BLOCK 16

b. COPIES

13. DATE OF SUBSEQUENT

SUBMISSION

18. ESTIMATED

TOTAL PRICE

a. ADDRESSEE

Final
Draft
Reg

N/A

16. REMARKS

1.4.1.1 Quality Control (QC): The contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QC program is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary. After acceptance of the QC Plan, the contractor shall obtain the KO’s (KO) acceptance in writing of any proposed changes to its QC system. The contractor shall submit required data in accordance with the Contract Data Requirements List (CDRL) DD Form 1423, A001, electronically to the addresses indicated on the DD

The beginning of the document. Download the full file to read on.

Other documents in this bid