Contract Data Requirements List A001 QC PLAN SIGNED
Updated
A PDF document (145 KB) attached to Switch Multiplexer Unit (SMU) Recap & Repair and Circuit Card Assembly (CCA) Eval & Repair, from the Department of the Army. Due Oct 30, 2026, 3:00 PM (UTC-4).
File name: 3_CDRL A001 QC PLAN_SIGNED.pdf
The full file is for paid members, or buy this bid alone.
Preview
Form Approved OMB No. 0704-0188
OMB Approval Expires 20221130
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0006, 1006, 2006
TDP
D. SYSTEM/ITEM
SWITCH MULTIPLEXER UNITS & CCA's
1. DATA ITEM NO.
C. CATEGORY:
B. EXHIBIT
OTHER QUALITY CONTROL PLAN
TM
E. CONTRACT/PR NO.
F. CONTRACTOR
GENERAL DYNAMICS MISSION SYSTEMS
2. TITLE OF DATA ITEM
3. SUBTITLE
QUALITY
QUALITY CONTROL PLAN
17. PRICE GROUP
A001
NSP
5. CONTRACT REFERENCE
4. AUTHORITY (Data Acquisition Document No.)
SEE BLOCK 16
7. DD 250 REQ
N/A
10. FREQUENCY
A
11. AS OF DATE
8. APP CODE
6. REQUIRING OFFICE
PWS PARA 1.4.1.1
9. DIST STATEMENT
REQUIRED
N/A
DIO
12. DATE OF FIRST SUBMISSION 14.
ONE PRELIMINARY
DISTRIBUTION
SEE BLOCK 16
b. COPIES
13. DATE OF SUBSEQUENT
SUBMISSION
18. ESTIMATED
TOTAL PRICE
a. ADDRESSEE
Final
Draft
Reg
N/A
16. REMARKS
1.4.1.1 Quality Control (QC): The contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QC program is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary. After acceptance of the QC Plan, the contractor shall obtain the KO’s (KO) acceptance in writing of any proposed changes to its QC system. The contractor shall submit required data in accordance with the Contract Data Requirements List (CDRL) DD Form 1423, A001, electronically to the addresses indicated on the DD
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Solicitation Notes
- Performance Work Statement SMU Refurbish Post SOL Rev6
- Contract Data Requirements List A002 ATP TEST DATA SIGNED
- Contract Data Requirements List A003 WARRANTY SIGNED
- WAGE DET 2015-6099 Revison 5
- Attachment A - SMU GFM Float Stock
- Attachment B - SMU RECAP Time-and-Material List
- Attachment C - SMU CCA Cards for Eval and Repair
- SOL