Performance Work Statement SMU Refurbish Post SOL Rev6
Updated
A PDF document (207 KB) attached to Switch Multiplexer Unit (SMU) Recap & Repair and Circuit Card Assembly (CCA) Eval & Repair, from the Department of the Army. Due Oct 30, 2026, 3:00 PM (UTC-4).
File name: 2_PWS SMU Refurbish_Post SOL_Rev6_09162026.pdf
The full file is for paid members, or buy this bid alone.
Preview
PERFORMANCE WORK STATEMENT (PWS)
FOR
RECAP AND REPAIR SWITH MULTIPLEXER UNITS (SMUs) AND
CIRCUIT CARD ASSEMBLIES (CCAs)
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, transportation, supervision, quality control and other items and non-personal services necessary to perform recapitalization (RECAP) and/or repairs, to working condition code A, on Switch Multiplexer Units (SMUs), Circuit Card Assemblies (CCAs) as defined in this PWS, except as specified in Paragraph 3.0, Government-Furnished Property, Equipment Materials or Services. The contractor shall perform to the standards in this contract. 1.2 Background: Contractor shall refurbish the SMU and Circuit cards to be refurbished to a working condition code A.
1.3 Period of Performance (Pop): The Period of Performance shall be one Base Year of 12 months and two 12month option periods. The Period of Performance reads as follows:
1.3.1 Base Year:
02 November 2026 to 01 November 2027
1.3.2 Option Year One:
02 November 2027 to 01 November 2028
1.3.3 Option Year Two:
02 November 2028 to 01 November 2029
1.4 General Information:
1.4.1.1 Quality Control (QC): The contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QC program is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary. After acceptance of the QC Plan, the contractor shall obtain the KO’s (KO) acceptance in writing of any proposed changes to its QC system. The contractor shall submit required data in accordance with the Contract Data Requirements List (CDRL) DD Form 1423, A001, electronically to the addresses indicated on the DD Form 1423.
1.4.1.2 The contractor shall maintain controls over all materials and products throughout the manufacturing process, including the identification of materials that have passed inspection and those that have not. The contractor shall maintain records identifying the status and final destination of all materials and products. 1.4.1.3 The contractor shall establish and maintain a system for controlling material that does not satisfy contract requirements (non-conforming material), including procedures for its identification, segregation, and disposition.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Solicitation Notes
- Contract Data Requirements List A001 QC PLAN SIGNED
- Contract Data Requirements List A002 ATP TEST DATA SIGNED
- Contract Data Requirements List A003 WARRANTY SIGNED
- WAGE DET 2015-6099 Revison 5
- Attachment A - SMU GFM Float Stock
- Attachment B - SMU RECAP Time-and-Material List
- Attachment C - SMU CCA Cards for Eval and Repair
- SOL