Contract Data Requirements List - A009
Updated
A PDF document (379 KB) attached to Vandenberg Crane Replacement, from the Department of the Air Force. Due Nov 23, 2026, 3:00 PM (UTC-7).
File name: CDRL - A009.pdf
The full file is for paid members, or buy this bid alone.
Preview
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
C. CATEGORY:
B. EXHIBIT
A
TDP
OTHER NDTI
TM
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
Vandenberg Building 9320 Hoist/Crane Replacement
TBD
F. CONTRACTOR
1. DATA ITEM NO.
3. SUBTITLE
TBD
2. TITLE OF DATA ITEM
A009
17. PRICE GROUP
Nondestructive Examination (NDE) Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
7. DD 250 REQ
LT
10. FREQUENCY
A
11. AS OF DATE
N/A
6. REQUIRING OFFICE
SOW Paragraph 3.12.2
9. DIST STATEMENT
REQUIRED
8. APP CODE
NSP
5. CONTRACT REFERENCE
309 MXSG/MASO
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
1/TIME
N/A
18. ESTIMATED
TOTAL PRICE
13. DATE OF SUBSEQUENT
SUBMISSION
0.00
b. COPIES
Block 16
a. ADDRESSEE
Draft
N/A
Final
Reg
Repro
16. REMARKS
(9) DISTRIBUTION STATEMENT A: Approved for public release. Distribution is unlimited.
(12) Due 30 calendar days prior to scheduled proof load testing; resubmittal only if required to correct deficiencies identified during Government review.
(14) One (1) copy of each submittal shall be provided electronically to each addressee in block 16 in Microsoft Office compatible format.
Submit electronically per SOW 3.12.2. The plan shall detail NDE test methods, coverage areas, and pass/ fail criteria. NDE results shall be included in the final test report. Addressees:
Alan Taylor 309 MMXG - EN
[email protected]
DSN: 586-9298
COMM: 801-586-9298
Mason Figueroa 309 MXSS/MXDVAAC
[email protected]
DSN: 777-2545
COMM: 801-777-2545
Shane Weston MXSG/MXDEQ
[email protected]
DSN: 586-8624
COMM: 801-586-8624
John Pedri 309 MXSG - COR
[email protected]
DSN: 775-6122
COMM: 801-775-6122
15.TOTAL
G. PREPARED BY
H. SIGNATURE
I. APPROVED BY
J. SIGNATURE
Paulette Johnson
DD FORM 1423, FEB 2024
UNCLASSIFIED
PREVIOUS EDITION MAY BE USED.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Name of preparer of CDRL.
Item H. Date CDRL was prepared and signature of preparer of CDRL.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- MXSG Statement of Work - Vandenburg Crane
- Contract Data Requirements List - A001
- Contract Data Requirements List - A002
- Contract Data Requirements List - A003
- Contract Data Requirements List - A004
- Contract Data Requirements List - A005
- Contract Data Requirements List - A006
- Contract Data Requirements List - A007
- Contract Data Requirements List - A008
- Contract Data Requirements List - A010
- Contract Data Requirements List - A011
- Contract Data Requirements List - A012