Contract Data Requirements List - A013
Updated
A PDF document (376 KB) attached to Vandenberg Crane Replacement, from the Department of the Air Force. Due Nov 23, 2026, 3:00 PM (UTC-7).
File name: CDRL - A013.pdf
The full file is for paid members, or buy this bid alone.
Preview
UNCLASSIFIED
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
C. CATEGORY:
B. EXHIBIT
A
D. SYSTEM/ITEM
1. DATA ITEM NO.
A013
TDP
E. CONTRACT/PR NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
Quality Control Plan (QCP)
5. CONTRACT REFERENCE
DI-QCIC-81794A
LT
F. CONTRACTOR
Quality Assurance Plan
4. AUTHORITY (Data Acquisition Document No.)
7. DD 250 REQ
OTHER QCIC
TM
10. FREQUENCY
A
11. AS OF DATE
A
NSP
6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
SOW Paragraph 6.2
9. DIST STATEMENT
REQUIRED
8. APP CODE
17. PRICE GROUP
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
One Time
NA
13. DATE OF SUBSEQUENT
SUBMISSION
0.00
b. COPIES
Block 16
a. ADDRESSEE
Draft
Block 16
Final
Reg
Repro
16. REMARKS
(4) Contractor's format is acceptable.
(9) DISTRIBUTION STATEMENT A: Approved for public release. Distribution is unlimited.
(12)(13) Submit plan within 30 days after contract award or within 14 days after the need for changes to an existing QCP. Plan shall be IAW PWS paragraphs referenced in BLK 5. Subsequent Submissions: When/If change(s) are made by Government or Contractor.
(14) One (1) copy of each submittal shall be provided electronically to each addressee in block 16 in Microsoft Office compatible format.
Addressee:
Charles Davis 309 MXSG - QAPC
[email protected]
DSN: 586-5673
COMM: 801-586-5673
15.TOTAL
G. PREPARED BY
H. SIGNATURE
I. APPROVED BY
J. SIGNATURE
Paulette Johnson
DD FORM 1423, FEB 2024
UNCLASSIFIED
PREVIOUS EDITION MAY BE USED.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Name of preparer of CDRL.
Item H. Date CDRL was prepared and signature of preparer of CDRL. Item I. Name of CDRL approval authority.
Item J. Date CDRL was approved and signature of CDRL approval authority. Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- MXSG Statement of Work - Vandenburg Crane
- Contract Data Requirements List - A001
- Contract Data Requirements List - A002
- Contract Data Requirements List - A003
- Contract Data Requirements List - A004
- Contract Data Requirements List - A005
- Contract Data Requirements List - A006
- Contract Data Requirements List - A007
- Contract Data Requirements List - A008
- Contract Data Requirements List - A009
- Contract Data Requirements List - A010
- Contract Data Requirements List - A011