Home / Construction Services for the Gate 7 Parking Garage St.… / Document

DB Wage Determination

Updated

A PDF document (68 KB) attached to Construction Services for the Gate 7 Parking Garage St. Elizabeths West Campus, from the Public Buildings Service. Due Nov 9, 2026, 4:00 PM (UTC-5).

File name: DC20260002 DB WD Sept 2026.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

9/25/26, 2:05 PM

SAM.gov

"General Decision Number: DC20260002 05/18/2026
State: District of Columbia
Construction Types: Building
Counties: District of Columbia Counties of
Washington, D.C.

Modification Number

Publication Date
01/16/2026
05/18/2026

ASBE0024-007 10/01/2024

Rates

ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES

THE APPLICATION OF ALL INSULATING MATERIALS,

PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL

TYPES OF MECHANICAL SYSTEMS)

A. PAID HOLIDAYS:

NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY,

THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND

CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE

REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY..$ 40.77

---------------------------------------------------------------ASBE0024-008 10/01/2024

Rates

ASBESTOS WORKER: HAZARDOUS MATERIAL HANDLER

INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,

SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL

INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS

OR NOT, FROM MECHANICAL SYSTEMS A. PAID HOLIDAYS:

NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY,

THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND

CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE

REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY..$ 24.46

---------------------------------------------------------------ASBE0024-014 10/01/2024

FIRESTOPPER

INCLUDES THE APPLICATION OF

MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS

AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES,

IN ORDER TO PREVENT THE PASAGE OF FIRE, SMOKE OF

OTHER GASES. THE APPLICATION INCLUDES ALL

COMPONENTS INVOLVED IN CREATING THE RATED BARRIER

AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE

HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS

BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF

PENETRATING ITEMS AND BLANK OPENINGS. A. PAID

HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
https://sam.gov/wage-determination/DC20260002/3

Rates

Fringes

20.17

Fringes

10.19

Fringes

9/25/26, 2:05 PM

SAM.gov

VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER

THANKSGIVING AND CHRISTMAS DAY PROVIDED THE

EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND

---------------------------------------------------------------BRDC0001-002 04/27/2025

Rates
---------------------------------------------------------------CARP0197-011 05/01/2024

Rates

CARPENTER: INCLUDES DRYWALL HANGING, FORM WORK, AND

---------------------------------------------------------------CARP0219-001 05/01/2025

The beginning of the document. Download the full file to read on.

Other documents in this bid