Gate 7 Garage 65 Construction Documents Structural Calculations
Updated
A PDF document (2.9 MB) attached to Construction Services for the Gate 7 Parking Garage St. Elizabeths West Campus, from the Public Buildings Service. Due Nov 9, 2026, 4:00 PM (UTC-5).
File name: Gate 7 Garage_65 Construction Documents_Structural Calculations.pdf
The full file is for paid members, or buy this bid alone.
Preview
Owner / Project
GSA
Capital Projects Division, Office of Design and Construction
Calculations for
Gate 7 Garage
65% Design Submission
Pages 1 - 139
Prepared by
A+F Engineers Inc.
1112 16th Street NW #720
Washington DC 20036
Date
17 August 2026
A & F Engineers Inc. – www.af-engineers.com – Maryland & Washington, DC – (202)-628-1600
ASCE Hazards Report
Address:
ASCE/SEI 7-22
Standard:
2701 Martin Luther King Jr
Risk Category: II
Ave SE
D - Stiff Soil
Soil Class:
Washington, District of Columbia
20032
Latitude: 38.852972
Longitude: -77.001158
Elevation: 132.14906479635525 ft
(NAVD 88)
Wind
Results:
Wind Speed
113 Vmph
10-year MRI
75 Vmph
25-year MRI
84 Vmph
50-year MRI
89 Vmph
100-year MRI
95 Vmph
300-year MRI
105 Vmph
700-year MRI
113 Vmph
1,700-year MRI
120 Vmph
3,000-year MRI
125 Vmph
10,000-year MRI
136 Vmph
100,000-year MRI
157 Vmph
1,000,000-year MRI
178 Vmph
Data Source:
ASCE/SEI 7-22, Fig. 26.5-1B and Figs. CC.2-1–CC.2-4, and Section 26.5.2
Date Accessed:
Thu Jul 03 2025
https://ascehazardtool.org/
Thu Jul 03 2025
Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear interpolation between contours. Wind speeds are interpolated in accordance with the 7-22 Standard. Wind speeds correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability = 0.00143, MRI = 700 years). Values for 10-year MRI, 25-year MRI, 50-year MRI and 100-year MRI are Service Level wind speeds, all other wind speeds are Ultimate wind speeds.
Site is not in a hurricane-prone region as defined in ASCE/SEI 7-22 Section 26.2.
https://ascehazardtool.org/
Thu Jul 03 2025
Seismic
Site Soil Class:
Results:
D - Stiff Soil
PGA M :
S MS :
S M1 :
S DS :
S D1 :
0.084
0.19
0.088
0.13
0.059
TL :
SS :
S1 :
V S30
:
0.15
0.042
Seismic Design Category: A
Multi-Period MCER Spectrum
Multi-Period Design Spectrum
Sa (g) vs T(s)
Sa (g) vs T(s)
Two-Period MCE R Spectrum
Two-Period Design Spectrum
Sa (g) vs T(s)
Sa (g) vs T(s)
MCER Vertical Response Spectrum
Vertical ground motion data has not yet been made
available by USGS.
https://ascehazardtool.org/
Design Vertical Response Spectrum
Vertical ground motion data has not yet been made
available by USGS.
Thu Jul 03 2025
Data Accessed:
Thu Jul 03 2025
Date Source:
USGS Seismic Design Maps based on ASCE/SEI 7-22 and ASCE/SEI 7-22 Table 1.5-2. Additional data for site-specific ground motion procedures in accordance with ASCE/SEI 7-22 Ch. 21 are available from USGS.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- 0918 Gate 7 Garage DBB Statement of Work FY25 v1
- Gate 7 Parking Garage Agreement 101
- Gate 7 Parking Garage Solicitation 201
- Solicitation Form (SF 1442) Gate 7 Parking Garage
- Attachment 1: Proprietary Information Agreement
- Attachment 2: PBS Past Performance Questionnaire
- DB Wage Determination
- Gate 7 Garage 65 Narrative
- Solicitation Amendment 1