01010 Statement of Work
Mechanical Construction Services – 2026
U.S. Department of Transportation
Federal Aviation Administration
Mike Monroney Aeronautical Center
Mechanical Construction Services
STATEMENT OF WORK
Prepared by FAA, Facility Management
Architecture and Engineering Division (AMP-400)
September 14, 2026
01010 Statement of Work
Mechanical Construction Services – 2026
1.0 GENERAL
1.1 CONTRACT REQUIREMENT
1.1.1 The Contractor must furnish all services, materials, supplies, personnel, and supervision to complete general project construction for alteration, extension, conversion, or modernization of existing facilities and new construction projects. These services will be required for commercial, industrial and utility type facilities located at the Mike Monroney Aeronautical Center.
1.2 CONTRACTOR USE OF SITE AND PREMISES
1.2.1 Access to Site: Limited to area required for construction of facility. Access location and route to and from access is subject to approval by FAA.
1.2.2 Construction Operations: Limited to areas noted on drawings. 1.2.3 Onsite construction related storage is to be confined to the defined construction area and is subject to FAA approval for use as storage. Contractors must request permission from FAA for any onsite construction related storage located outside the construction area but still on FAA campus.
1.3 HOURS OF OPERATIONS
1.3.1 The contract work shall be conducted from 7:00 a.m. to 4:30 p.m. No work shall occur at night, or on Saturdays, Sundays and Federal holidays unless a special order or permit is given by the Contracting Officer to do so or if specified by specific tasking. Eight (8) hours shall constitute 1 day of work, and the Contractor shall observe all state laws and City Ordinances governing the hours of work. 1.3.2 Outage Notices: provide advance notice as listed below for the applicable outage or assistance requirement.
Minor Outage: Provide a minimum of 8 business days advance notice. An example of a minor outage is an electrical panel that serves a single room or multiple rooms, but not the entire building or floor. Major Outage: Provide a minimum of 12 business days advance notice. Examples of a major outage is an electrical outage that serves an entire floor or entire building. Weekend Outage: Provide 12 business days advance notice. Multiple Building Outages: Provide a minimum 35 business days advance notice. Outages where FAA support is required: Provide a minimum of 12 business days advance notice.