Draft Performance Work Statement
Updated
A PDF document (262 KB) attached to Danobat Spherical Grinder PM, from the Department of the Navy. Due Nov 24, 2026, 12:00 PM (UTC-10).
File name: DRAFT PWS.pdf
The full file is for paid members, or buy this bid alone.
Preview
Performance Work Statement (PWS)
Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility Danobat Spherical Grinder
Preventive Maintenance Inspection and Remedial Services 1.
Background:
1.1.
Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF) is a US Navy regional industrial center that maintains, overhauls, and repairs various vessels of the US Navy. Its industrial operations provide the US naval forces with a wide range of services and resources located on the island of Oahu, Hawaii, with direct and indirect support to SSN 688 and 774 class submarines, surface vessels and shore based activities in the Pacific
2.
Objective and Scope:
2.1.
The Contractor shall supply a Manufacturer Trained Certified Technician to perform annual preventive maintenance services on 1EA. Danobat Spherical Grinder. The Contractor shall perform on-site, preventive maintenance, repair, calibration, and remedial services (repairs required outside scope of annual preventive maintenance), to include an inspection report on 1EA. Danobat Spherical Grinder Manufacturer
Danobat Inc.
Model
BGM-600
Serial no
600231
Location
B-67
3.
Performance Location:
3.1.
The Place of performance shall be within the Controlled Industrial Area (CIA) of Pearl Harbor Naval Shipyard & IMF
4.
Performance Requirements:
4.1.
Preventive Maintenance. The contractor shall provide all management, parts, labor, materials, supplies, transportation and tools required for preventive maintenance of all equipment in paragraph 2.1 in accordance with the applicable manufacturer’s manual to ensure proper operation of equipment. Contractor shall provide a contact phone number and alternate phone number for use during the contract duration. The contractor shall notify the Technical Point of Contact (TPOC) if any machine covered under this contract cannot be restored to operational status within the contract period. The Contractor shall create complete system backups, prior to and after any configuration changes to hardware or software to ensure no loss of data. All software upgrades, if required, shall be provided. The Contractor shall ensure that upgrades include all applicable software licensing agreements.
4.1.1. Preventive Maintenance Service. The Contractor shall provide one, (1) on-site preventive maintenance service within the period of performance. The PM visit shall be scheduled with the Contracting Officer’s Representative (COR) and TPOC to avoid disruption to shop operations schedule. Preventive Maintenance Service shall be in
The beginning of the document. Download the full file to read on.