Home / Increase Emergency Power / Document

Drawings

Updated

A PDF document (14.3 MB) attached to Increase Emergency Power, from the Department of Veterans Affairs. Due Dec 18, 2026, 3:30 PM (UTC-5).

File name: S02_Drawings.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

DocuSign Envelope ID: D0706C35-4D5B-4B25-99D5-D09F646DA01F

INCREASE EMERGENCY POWER

DISTRIBUTION

VAMC PROVIDENCE

830 CHALKSTONE AVE.

PROVIDENCE, RI 02908

VA PROJECT #: 650-22-104

N

PROJECT LOCATION MAP

N

BUILDING 1 PROJECT SITE

PROJECT LOCATION

CONSTRUCTION ACCESS/ LAYDOWN/ PARKING MAP

N

PROJECT LOCATION

DRAWING LIST

ENLARGED SITE PLAN

N

PROJECT SITE MAP

UP

WING B

WING A

C:\Users\gscott\Documents\A_21-242 Providence VA Increase Emergency [email protected]

E WING

ARMED FORCES BLVD.

AREAS OF WORK

PARKING LOT 8

CONCRETE SIDEWALK AND GENERATOR PAD (SEE CIVIL AND STRUCTURAL DRAWINGS FOR SITEWORK)

EMERGENCY GENERATORS (SEE CIVIL, STRUCTURAL AND ELECTRICAL DRAWINGS)

SWITCH BUILDING 43

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

CONSULTANTS:

PROJECT MANAGER

ACG Project Number
21-242

Headquarters:

Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511
Engineers

5/1/2023 4:26:25 PM

GENERAL

G-001

COVER

G-002

SITE AND CONSTRUCTION ACCESS PLAN

G-003

ARCHITECTURAL NOTES, MOUNTING HEIGHTS, SYMBOLS

G-004

ICRA INFORMATION AND DETAILS

G-005
BASEMENT FLOOR INFECTION CONTROL BARRIER, CONSTRUCTION ACCESS AND LIFE SAFETY PLAN G-006

ENLARGED INFECTION CONTROL BARRIER AND LIFE SAFETY PLANS

G-007

SWITCH BUILDING LIFE SAFETY PLAN

HAZARDOUS ABATEMENT

HA101

ABATEMENT DESIGN

CIVIL

C001

CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES

C101

CIVIL EXISTING CONDITIONS / DEMOLITION PLAN

C102

CIVIL SITE PLAN

C103

CIVIL EROSION CONTROL PLAN

C301

CIVIL UTILITY PROFILE

C-501

CIVIL DETAILS

STRUCTURAL

S-001

STRUCTURAL GENERAL NOTES I

S-002

STRUCTURAL GENERAL NOTES II

S-003

STRUCTURAL GENERAL NOTES III

S-004

DEVELOPMENT LENGTH AND LAP SPLICE LENGTH TABLES

S-005

LOADING DIAGRAMS

S-101

SWITCHGEAR BUILDING AND CATWALK PLANS

S-201

FOUNDATION SECTIONS AND DETAILS

S-202

TYPICAL SLAB ON GRADE DETAILS

S-500

STRUCTURAL STEEL SECTIONS AND DETAILS

S-501

STRUCTURAL STEEL SECTIONS AND DETAILS

S-502

STRUCTURAL STEEL SECTIONS AND DETAILS

S-503

STRUCTURAL STEEL SECTIONS AND DETAILS

ARCHITECTURAL

AE001

ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES

AE100

PARTIAL BASEMENT FLOOR PLAN

AE101

PARTIAL FIRST, SECOND AND THIRD FLOOR PLANS

AE102

SWITCH BUILDING PLANS, ELEVATIONS AND DETAILS

AE601

REFLECTED CEILING PLAN, SCHEDULES AND DETAILS

MECHANICAL

M-001

MECHANICAL GENERAL INFORMATION

M-101

SWITCH BUILDING MECHANICAL PLAN

ELECTRICAL

E-001

ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS

E-002

TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS

ES101

ELECTRICAL SITE PLAN

EP101

BASEMENT FLOOR POWER PLAN

EP102

THIRD FLOOR POWER PLAN

E-401

ELECTRICAL ENLARGEMENTS