EIC Hazard Analysis Report 2025
Updated
A PDF document (985 KB) attached to A-E Services for Electron Injector Complex, from the Department of Energy. Due Nov 30, 2026, 5:00 PM (UTC-5).
File name: EIC-ESH-PLN-008 EIC Hazard Analysis Report 2025.pdf
The full file is for paid members, or buy this bid alone.
Preview
Docusign Envelope ID: 523AA072-4370-4B45-93D7-E4C7DA7E61AB
The only official copy of this document is the one online in the SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s Revision History log with that of the online version. Electron-Ion Collider, Brookhaven National Laboratory
Doc No. EIC-ESH-PLN-008
Author: C. Schaefer
Effective Date: September 16, 2025
Plan: Hazard Analysis Report for Electron-Ion Collider
Review Frequency: 5 years
Revision: 05
Electron-Ion Collider Plan
Hazard Analysis Report for
Electron-Ion Collider
September 16, 2025
Prepared by:
Chuck Schaefer, ES&H Manager
Electron-Ion Collider, Brookhaven National Laboratory
9/18/2025
William Rainey, ES&H Manager
Electron-Ion Collider, Thomas Jefferson National Laboratory
9/22/2025
Reviewed by:
Luisella Lari, Project Manager
Electron-Ion Collider, Brookhaven National Laboratory
9/25/2025
Katherine Wilson, EIC Deputy Project Director (Interim) Electron-Ion Collider, Thomas Jefferson National Accelerator Facility
9/29/2025
Approved by:
Jim Yeck, Project Director
Electron-Ion Collider, Brookhaven National Laboratory
10/7/2025
Docusign Envelope ID: 523AA072-4370-4B45-93D7-E4C7DA7E61AB
The only official copy of this document is the one online in the SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s Revision History log with that of the online version. Electron-Ion Collider, Brookhaven National Laboratory
Doc No. EIC-ESH-PLN-008
Author: C. Schaefer
Effective Date: September 16, 2025
Plan: Hazard Analysis Report for Electron-Ion Collider
Review Frequency: 5 years
Revision: 05
REVISION HISTORY
Revision #
Effective Date
List of Reviewers
12/15/2020
9/27/2023
10/24/2023
9/27/2024
J. Fast, L. Lari
W. Rainey, C. Schaefer
9/16/2025
K. Wilson, L. Lari
W. Rainey, C. Schaefer
L. Stiegler, A. Lung,
J. Yeck, R. Caradonna
P. Collins
J. Fast, L. Lari
W. Rainey, C. Schaefer
J. Fast, L. Lari
W. Rainey, C. Schaefer
Summary of Change
First Issue
Updated for CD-3A
Update to incorporate CD-3A
Director’s Review Comments
Update to incorporate recent
project changes and address
comments from OPA CD-3A
review
Update to address OPA CD-3B
review comments and Electron
Injector System
Docusign Envelope ID: 523AA072-4370-4B45-93D7-E4C7DA7E61AB
The only official copy of this document is the one online in the SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s Revision History log with that of the online version.
The beginning of the document. Download the full file to read on.