Home / A-E Services for Electron Injector Complex / Document

Quality Assurance Plan for EIC

Updated

A PDF document (633 KB) attached to A-E Services for Electron Injector Complex, from the Department of Energy. Due Nov 30, 2026, 5:00 PM (UTC-5).

File name: EIC-QAG-PLN-002 Quality Assurance Plan for EIC.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Docusign Envelope ID: DFDBD754-1637-4D18-A222-D1C8ED214F6D

The only official copy of this document is the one online in the SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s Revision History log with that of the online version. Electron-Ion Collider, Brookhaven National Laboratory

Doc No. EIC-QAG-PLN-002

Author: C. Porretto

Effective Date: December 17, 2024

Plan: Quality Assurance Plan for the Electron-Ion Collider

Review Frequency: 5 years
Revision: 05

Electron-Ion Collider Plan

Quality Assurance Plan for the Electron-Ion Collider
December 17, 2024
Prepared by:

12/17/2024

Christopher Porretto, Quality Assurance Manager

Reviewed by:
12/19/2024

Glenn Falluca, QMO Manager

12/17/2024

Luisella Lari, EIC Project Manager

12/17/2024

Sergei Nagaitsev, EIC Technical Director

12/17/2024

Jacob Harris, Quality Assurance Manager for TJNAF Partnership

Jim Fast, EIC Associate Project Manager for TJNAF Partnership

12/17/2024

Docusign Envelope ID: DFDBD754-1637-4D18-A222-D1C8ED214F6D

The only official copy of this document is the one online in the SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s Revision History log with that of the online version. Electron-Ion Collider, Brookhaven National Laboratory

Doc No. EIC-QAG-PLN-002

Author: C. Porretto

Effective Date: December 17, 2024

Plan: Quality Assurance Plan for the Electron-Ion Collider

Review Frequency: 5 years
Revision: 05

Approved by:
Jim Yeck, EIC Project Director

12/17/2024

Docusign Envelope ID: DFDBD754-1637-4D18-A222-D1C8ED214F6D

The only official copy of this document is the one online in the SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s Revision History log with that of the online version. Electron-Ion Collider, Brookhaven National Laboratory

Doc No. EIC-QAG-PLN-002

Author: C. Porretto

Effective Date: December 17, 2024

Plan: Quality Assurance Plan for the Electron-Ion Collider

Review Frequency: 5 years
Revision: 05

REVISION HISTORY

Revision #

Effective Date

Summary of Change

February 2020

Initial Draft

November 2020

Added collaboration with TJNAF as major
partner.

August 2023

Added references to In-kind Contributions and
PPD docs; added references to requirements
management plan and requirement documents;
added reference to configuration control
assessments; added Appendix A; minor updates,
e.g., delete references to DOE LL Listserver.

The beginning of the document. Download the full file to read on.

Other documents in this bid