Encl-1.3 Out-of-Cycle Opportunity
Updated
A PDF document (504 KB) attached to Broad Agency Announcement TRMC TE-ST W900KK-22-R-0012, from the Department of the Army. Due Mar 14, 2030, 5:00 PM (UTC-4).
File name: Encl-1.3_Out-of-Cycle Opportunity_3 Nov 2022.pdf
The full file is for paid members, or buy this bid alone.
Preview
ENCLOSURE 1.3: W900KK-22-R-0012
OUT-OF-CYCLE OPPORTUNITIES
I.
GENERAL INFORMATION
A. Closing Date: 30 September 2023. This Opportunity Notice shall remain in effect for abstract submissions until the closing date has passed. B. TTA-Specific Topics: If listed under a TTA, topics are grouped and numbered in the following sections by TTA per numbered domains.
C. Out-of-Cycle ‘Other Test Technologies’ Topic
This category encourages offeror consideration to address technology research opportunities (which may include studies) in areas that are not identified among currently active/ listed topics but may be beneficial and critical to the future of the technologies that address DoD test needs for rapid transition into the T&E infrastructure. This may identify potentially revolutionary weapon and sensor systems needing T&E capabilities that are currently “unknown unknowns” to the Government.
All Out-of-Cycle topics first require an abstract submission prior to a white paper submission per Enclosure 1 – Research Opportunity Guidance.
D. Table Legend
In-Cycle vs. Out-of-Cycle Opportunity Notice Type
TTAs: Test Technology Areas’ initialisms are listed below:
Autonomy and Artificial Intelligence Test (AAIT)
Advanced Instrumentation Systems Technology (AIST)
Command, Control, Communications, Computers, Intelligence, and Software Intensive Systems Test (C4T)
Cyberspace Test Technology (CTT)
Directed Energy Test (DET)
Electronic Warfare Test (EWT)
High Speed Systems Test (HSST)
Space Systems Test (SST)
Spectrum Efficient Technology (SET)
‘Part.’: Indicates if the TTA is participating in this opportunity release (Yes/No) TTA Topics: Indicates if TTA-specific topics are listed herein (Yes/No) ‘Other’: Indicates if the ‘Other Test Technologies’ topic applies to this release (Yes/No).
TRMC T&E/S&T Enclosure 1.3: page 1
ENCLOSURE 1.3: W900KK-22-R-0012
OUT-OF-CYCLE OPPORTUNITIES
E. Tabular Opportunities Listings
The tables below show TTA participation for the listed ‘cycle’ type. Only TTA domains where topics are issued will be numbered in this Opportunity Notice. Specified topics within this document can be accessed easily using the hyperlinks in the tables below: Out-of-Cycle
TTA
AAIT
AIST
C4T
CTT
DET
EWT
HSST
SST
SET
Part.
Yes
Yes
Yes
Yes
No
No
Yes
No
Yes
Topics
Yes
Yes
Yes
Yes
No
No
Yes
No
Yes
‘Other’
No
No
No
No
No
No
No
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Annex TTA Descriptions v1
- Attachment 10: Cost Volume Template
- Attachment 12: Basis of Estimate Desk Guide
- Attachment 3: Govt Data Rights Acknowledgement
- Attachment 4: IP and Data Rights Assertions
- Attachment 5: Admin and Natl Policy Requirements
- Encl-1 Research Opportunity Guidance
- Encl-2 Project Structure Guidelines
- Encl-5 Admin and Natl Policy Requirements
- Encl-1.1 In-Cycle Opportunities REV
- Encl-3 White Paper Submission Instr REV
- Attachment 13: Abstract Template REV