Exhibit E Form 1364
Updated
A PDF document (761 KB) attached to Lease Medical Space, 19,000 ABOA, from the Department of Veterans Affairs. Due Dec 18, 2026, 4:00 PM (UTC-6).
File name: Exhibit E Form 1364.pdf
The full file is for paid members, or buy this bid alone.
Preview
Exhibit E
In Response to Request for Lease
Proposals (RLP) Number
PROPOSAL TO LEASE SPACE
36C25527R0011
DATED
SECTION I - DESCRIPTION OF PREMISES
1. BUILDING
DESCRIPTION
a. Building Name
b.
Building Street Address
Farmington, MO CBOC
c.
City
d.
Farmington
State
e.
9-Digit ZIP Code
f.
2a. FLOORS OFFERED
2b. TOTAL NUMBER
OF FLOORS IN BUILDING
Congressional District
63640
MO
3. TOTAL RENTABLE SPACE IN OFFERED BUILDING
a.
GENERAL PURPOSE
(Office)
b.
WAREHOUSE
6.
YEAR OF LAST
MAJOR RENOVATION
(if applicable)
7.
BUILDING AGE
c.
OTHER
8.
SITE SIZE
SF
4.
LIVE FLOOR LOAD
5.
Pounds per SF
MEASUREMENT
METHOD
SF
x ANSI/BOMA
SF
OTHER
Acres
SECTION II - SPACE OFFERED AND RATES
9.
ANSI/BOMA OFFICE AREA
SQUARE FEET (ABOA)
10,903
10. RENTABLE SQUARE FEET
(RSF)
11. COMMON AREA FACTOR (CAF)
“Tenant Improvements” are all alterations for the Government-demised area above the building shell buildout, excluding costs identified as tenant improvements in the Security Unit Price List. Building Specific Amortized Capital (BSAC) is the sum of costs identified as such in the Security Unit Price List. Neither the Tenant Improvements as stated in Block 12, nor the BSAC as stated in Block 13, are to be included in the shell rent. It is expected that the tenant buildout will be fully amortized at the end of the firm term, and the rent will be reduced accordingly. Any desired rent increases or decreases beyond the firm term of the lease should be reflected in the shell rate and fully explained as part of this written proposal. If Tenant Improvements or BSAC improvements are to be amortized beyond the firm term, those calculations must be itemized as part of this written proposal. The Offeror may attach additional pages as necessary.
Number of years each cost per square foot
is in effect. State any changes for any rent
component.
a.
b.
c.
d.
e.
f.
BUILD-OUT COSTS PER
CATEGORY
AMORTIZATION
TERM
AMORTIZATION
INTEREST RATE
(%)
ANNUAL RENT
ANNUAL RENT
NUMBER YEARS
RATE IS
EFFECTIVE
12. TENANT IMPROVEMENTS
(per RLP requirements)
$
XXXXXXXXX
XXXXXXXXX
13. BSAC
(per RLP requirements)
$ 209k allowance
XXXXXXXXX
XXXXXXXXX
14. SHELL BUILD-OUT
(per RLP requirements)
$
15. TOTAL BUILD-OUT COSTS
$ PER ABOA
$ PER RSF
xxxx
xxxx
xxx
xxxx
xxxx
xxx
PER SF RATE
FOR YEARS
$
16. SHELL RENT (Including real
estate taxes. Refer to Line 28 on
GSA Form 1217)
$
$
17. OPERATING COSTS (Refer to
Line 27 on GSA Form 1217)
$
$
$
$
18. TOTAL RATE/SF
19. TOTAL ANNUAL RENT
$
PER SF RATE
20. STEP RENT (SHELL RATES)
21. PARKING
a.
b.
c.
d.
FOR YEARS
PER SF RATE
FOR YEARS
Number of parking spaces for the entire building/ facility which are under the control of the Offeror:
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Farmington RLP
- Exhibit A ASR
- Exhibit B Facility security level II
- Exhibit C 3516 SOLICITATION PROVISIONS
- Exhibit D 3517B General Clauses (Mar. 2026)
- Exhibit F - Form 1217 - Lessor s Annual Cost Statement
- Exhibit G - GSA 12000 - PART A
- Exhibit H Security Unit Price List
- Exhibit I Seismic Forms
- Exhibit J 552.270-33 Foreign Ownership
- Exhibit L New Construction
- Exhibit M Farmington Lease