Exhibit R New Construction L100 Exhibit
Updated
A Word document (2.3 MB) attached to Request for Lease Proposals (RLP) for Olympia, WA CBOC, from the Department of Veterans Affairs. Due Dec 1, 2026, 5:00 PM (UTC-8).
File name: 20. Exhibit R_New Construction L100 Exhibit (May 2026).docx
The full file is for paid members, or buy this bid alone.
Preview
EXHIBIT X R NEW CONSTRUCTION
ACTION REQUIRED: Use only when a newly constructed building is the only solution that will meet the CUSTOMER’s needs and existing buildings are not competing. Otherwise, delete. note: paragraph must be added back in VIA RLP AMENDMENT if, AT ANY POINT PRIOR TO FPR, THE GOVERNMENT ONLY HAS OFFERS FOR New construction. ACTION REQUIRED: use “RELOCATION ASSISTANCE ACT“ only for new construction where an improved site will result in displacement. otherwise, delete. MAY BE ALTERED, BUT SHOULD CONTAIN SUBSTANTIALLY THE SAME INFORMATION. NC 1.01 is added to the Lease, Section 2 General terms, Conditions, and Standards.
NC 1.01RELOCATION ASSISTANCE ACT (FEB 2026) INTENTIONALLY DELETED
If the Lessor satisfies the requirements of this Lease by performing new construction on an improved site, and such new construction will result in the displacement of individuals or businesses, the Lessor must be responsible for payment of relocation costs in accordance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Public Law 91-646), as amended, and the implementing regulations at 49 CFR Part 24.
The Lessor must give GSA the name of the person and agency to be providing the relocation assistance to site tenants. In addition, the Lessor must provide background information about the relocation agency and references for which the relocation agent has performed relocation assistance in the past. ACTION REQUIRED: the following paragraph, which ADDRESSES “prevailing wages” REQUIREMENTS under the davis-bacon act, is mandatory when delivery schedules are long enough to permit satisfaction of the lease requirements through new construction or complete rehabilitation or reconstruction of an EXISTING building. If no offers of new construction or complete rehabilitation or reconstruction of an existing building are received, delete. the official website for obtaining wage Determinations is sam.gov. NOTE: in situations where there is a QUESTION about APPLICABILITY, lcos should consult Office of the General Counsel - Leasing Division (OGC – LR) for guidance. Action required: when including this PARAGRAPH, attach the appropriate Department of Labor wage determination for the applicable geographical area. any subsequent modifications to dol wage determinations must be issued as an amendment to the rlp. NOTE: if a change occurs to the wage determination after the receipt of Final Proposal Revisions but prior to lease award, the lco must reopen negotiations to allow the offeror to revise its price. For changes to the wage determination after lease award, the Civilian Board of Contract Appeals has held that modifications to the wage rates are not required to be implemented into existing contracts post award except where a mistake has been made, e.g., not incorporating one at all, or inserting the wrong determination.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- OIympia CBOC RLP
- Exhibit A L100 Olympia
- Exhibit B - ASR with Janitorial New Olympia
- Exhibit B-1 UPDATED-SEPS PFD OLYMPIA
- Exhibit B-2 VA-Leased-CBOCDesignNarrative-2026-02-06
- Exhibit B-3 Room Matrix Table Olympia rev
- Exhibit C VA Security Requirements (FSL Level II)
- Exhibit G - Form 1217 Lessor's Annual Cost Statement (Nov. 2016) VA-GP
- Exhibit H FLS PartA v- VA-GP
- Exhibit I Seismic Offer Forms A - F with instructions VA-GP
- Exhibit J DB wage Thurston County VA-Oly
- Exhibit K PastPerf Questionnaire VA-REV