FA Form 260
Updated
A PDF document (114 KB) attached to F110 Nozzle Turbine AIRC, NSN: 2840-01-289-8529PR, PN: 9525M21G02, from the Defense Logistics Agency. Due Dec 7, 2026, 4:00 PM (UTC-6).
File name: FA_Form_260.pdf
The full file is for paid members, or buy this bid alone.
Preview
1. DATE
FIRST ARTICLE REQUIREMENTS
15 JUL 2026
(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)
2. PR / MIPR NUMBER
3. CAGE / REFERENCE NUMBER
4. NSN
07482 / 9525M21G02
2840012898529PR
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 3
AND WILL BE:
UNIT(S) OF LOT / ITEM Item
PART OF PRODUCTION QUANTITY
X IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL
7. LONG LEAD TIME ITEMS
X WILL NOT
SERVE AS A MANUFACTURING STANDARD
REQUIRED
X NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED
NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A.
CONTRACTOR TESTING
X GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are Specified on part drawing, or called out on specifications, and on engineering instructions.
B. The detailed technical requirements for First Article approval tests are contained in Specified on part drawing, or called out on specifications, and on engineering instructions. (Cite Spec and Para number)
C.
TEST PLAN REQUIRED
(1) DD Form 1423 ELIN
(2) Delivery due
calendar days from date of contract.
(3) Number of days for government approval / disapproval
days.
D. Contractor's notification to ACO and
(Requesting Activity)
of test time and location due
E.
days prior to start of testing.
TEST REPORT REQUIRED
(1) DD Form 1423 ELIN
(2) Due
calendar days from date contract.
(3) Forwarded to
(4) Government written notice of approval / disapproval due
days after receipt of contractor's report.
AFMC IMT 260, 20230316, V-5, PREVIOUS EDITION IS OBSOLETE
Prescribed by: AFMCI23-110
Generated by PRPS using Jasper Reports on 23 Sep 2026
Version 2
1. DATE
FIRST ARTICLE REQUIREMENTS
15 JUL 2026
(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)
F. FIRST ARTICLE DELIVERY
(1) Due within 180
calendar days from date contract.
(2) Notify 30
calendar days prior to shipment.
(3) Delivered to government at
See block 12 for mailing/details
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 180
The beginning of the document. Download the full file to read on.