FS-Statement of Work-KAW Access Control Repairs
Updated
A PDF document (661 KB) attached to Troubleshooting and repair of access control panels on the Superior National Forest, from the Forest Service. Due Oct 30, 2026, 1:00 PM (UTC-5).
File name: C04b - FS-SOW-KAW Access Control Repairs.pdf
The full file is for paid members, or buy this bid alone.
Preview
Superior National Forest
Kawishiwi Access Control
Repairs
Scope of Work (SOW)
Dated: 2026
Background
The Kawishiwi Ranger District within the Superior National Forests has a need to repair two exterior entrances and one interior entrance that no longer allow access to employees using their key fobs. The goal of this contract is to have the contractor troubleshoot and repair the access control system at these entrances.
Entrance Door to Be Repaired
GENERAL REQUIREMENTS
1.0 Description of Services:
The contractor shall provide all management, supervision, labor, personnel, transportation, materials, equipment, and supplies, except as otherwise specified, necessary to provide services at the Kawishiwi Ranger District located in Ely, MN. All work shall be performed in accordance with this statement of work and all federal, state, and local laws and regulations.
2.0 Location and Description:
The project is located within the Superior National Forest at the Kawishiwi Ranger District located in Ely, MN. The Kawishiwi Ranger District is located at the following address:
Superior National Forest – KAW Access Control Repairs
Kawishiwi Ranger District
1393 Highway 169
Ely, MN 55731
2.1 Accessibility:
The site is accessible by a paved driveway and parking lot. The driveway and parking lot are routinely clear of snow during the winter months.
3.0 Performance Period:
This project is expected to be completed 90 days after the award of the contract.
4.0 Prework Conference:
Prior to commencement of work, the Contracting Officer (CO) or the Contracting Officer Representative (COR) will schedule a meeting with the contractor to discuss the contract terms, work requirements and schedule. At the conference, the Contractor shall designate, in writing, the name and phone number of the Contractor’s on-site representative and their contract responsibilities and authority.
5.0 Contractor Representative:
Provide an onsite contract representative who will oversee the performance of the work specified in this contract. Designate in writing to the CO, the name of the contract representative and an alternate(s) who shall have the authority to authority to act for the Contractor on all contract matters relating to daily operation of this contract. Notify the CO/COR at least 10 work days in advance of any subsequent change of personnel in this position. Replacement personnel shall have the same level or better experience as the person being replaced.
6.0 Government-Furnished Items:
The beginning of the document. Download the full file to read on.