Ft Bragg Installation Design Guide (Condensed)
Updated
A PDF document (1.9 MB) attached to Contractor-owned, Contractor-operated (COCO) bulk retail services at two locations on Fort Bragg, NC., from the Defense Logistics Agency. Due Oct 30, 2026, 5:00 PM (UTC-4).
File name: Ft Bragg Installation Design Guide (Condensed) Aug 2026.pdf
The full file is for paid members, or buy this bid alone.
Preview
CONDENSED INSTALLATION DESIGN GUIDE
For
DLA ENERGY-FUNDED
CONTRACTOR-OWNED, CONTRACTOR-OPERATED (COCO)
FUEL FACILITIES
AT
FORT BRAGG, NC
1.
General: The information in this guide is comprised of a collection of Fort Bragg design and construction policies consolidated by DLA Energy to serve as the Installation Design Guide (IDG) until a more formal and presentable version is developed. It contains information to assist offerors in developing design and cost proposals for Contractorowned, Contractor-operated fuel facility services at Fort Bragg, NC. Not all guidance in the IDG will apply to these facilities as described in the paragraph below.
2.
IDG Applicability and Limitations: Most of the IDG and Governmental standards found in Unified Facility Criteria (UFC) directives do not apply to the structural design of these facilities due to the temporary (29 years) nature of these contractor-owned, contractor-maintained, contractor-operated fuel facilities, but this paragraph will help differentiate. A. Design: This is neither Military Construction (MILCON), nor government-owned or government-maintained infrastructure; therefore, the UFC structural design specifications do not apply unless specifically included in the contract. Commercial Design specifications will be used for the fuel facility (such as NFPA 30 and 30A) and associated infrastructure, except for those infrastructure components or systems that must integrate, connect, or interface with base infrastructure, utilities, systems, or equipment. That infrastructure or component will be compatible, allowing tie-in and function with the existing government infrastructure as necessary. Structural exterior appearances and landscaping will match the surrounding government structures in accordance with the IDG to blend visually.
B. Oversite: Various Permitting Offices will have regulatory oversite authority as required for their permit. Department of Public Works (DPW) will provide construction permits and associated project oversite to ensure compliance with regulatory and permit directives, Installation regulatory/policy, and contract requirements.
C. Review: Elements of government review/approval are reduced but not eliminated. Plans will be provided to the DPW as required for permits, utility integration, stormwater, erosion control, and project oversite. Government review and approval of the Contractor’s design submittals (35%, 65%, 95%, 100%) is solely for verification of compliance with the Ground Lease, Base Master Plan, Safety, and Environmental standards.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment I - Ft Bragg COCO Performance Work Statement as of
- Attachment II - Past Performance Questionnaire Form
- Attachment III - PP Consent Form
- Attachment IV - Past Performance Reference List
- Attachment VI - Ft Bragg Fuel Facility Site Data Addendum
- (Ft. Bragg)
- Bid document
- Amendment 6
- Attachment XI Services Performance Work Statement
- Attachment XII Fuel Facility Construction Addendum