U.S. Geological Survey
3D National Topography Model (3DNTM) Data Collaboration Announcement (DCA) for 3D Elevation Program (3DEP)
3DEP-E: Estimated Timeline for 3DEP Data Validation
The following is an estimated timeline of the data validation process after data is delivered to the USGS. This document is a guideline only and actual dates may vary. Larger projects may be broken into smaller blocks each known as a “work unit”. These work units are delivered to USGS by the data provider often in staggered deliveries with one or more work units in each delivery. Some projects may be small enough to be delivered as one work unit. The USGS reviews each work unit individually.
After a work unit is delivered to the USGS it is assessed to ensure the data were delivered in the proper format. Following confirmation of proper data formatting, the validation process will begin. The initial review process can take up to ninety (90) days after the work unit is delivered to USGS. Feedback is submitted to the USGS point of contact who communicates it back to the partner and/or data provider. Data providers have sixty (60) days to provide data corrections if requested. USGS has thirty (30) days to complete the review of the corrected deliverables. If the data still require corrections after evaluation, the correction cycle may be repeated. As soon as a work unit has been validated, the lidar point cloud (LPC) and source digital elevation model (DEM) are ready for publication on The National Map. The goal is to publish the LPC and the source DEM (sDEM) for a work unit within sixty (60) days of validation. This process of validation and publication is repeated for each work unit that comprises the entire project. While the individual work unit level data will be available on The National Map, the individual work unit will not be considered fully accepted and validated until all work units for the entire project have been validated and the final vertical accuracy has been verified. The vertical accuracy assessment may take up to ten (10) days after the final work unit publication. The USGS 1-meter DEM and seamless products will be generated and published on The National Map within sixty (60) days of the last work unit publication.
FY26 3DEP-E: Estimated Timeline for 3DEP Data Validation
U.S. Geological Survey
3D National Topography Model (3DNTM) Data Collaboration Announcement (DCA) for 3D Elevation Program (3DEP)
Delivery
Work Unit
Initial
Review
90 days
Corrections
Requested
The beginning of the document. Download the full file to read on.
Other documents in this bid
- 3DNTM DCA Broad Agency Announcement Program Announcement 1
- FY27 DCA - DCA Project Summary Form v1 1
- FY27 DCA - Instructions for Creating 3DEP Defined Project Area and Tile Delivery Scheme 1
- FY27 DCA - Project Planning Estimate 1
- FY27 DCA - Validation of Proposed Funding Partners 1
- FY27 DCA - DCA Project Summary Form v1 1
- FY27 DCA - Instructions for Creating 3DHP Project Boundaries 1
- FY27 DCA - Request for Planning Project Estimate 1
- FY27 DCA - Validation of Proposed Funding Partners 1
- FY27 DCA - 3DHP Data Validation Timeline 1