FY27 DCA - Project Planning Estimate 1
Updated
A PDF document (298 KB) attached to Broad Agency Announcement (BAA) 3DNTM, from the US Geological Survey. Due Dec 4, 2026, 5:00 PM (UTC-5).
File name: FY27_DCA_3DEP-C_-_Project_Planning_Estimate_1.pdf
The full file is for paid members, or buy this bid alone.
Preview
U.S. Geological Survey
3D National Topography Model Data Collaboration Announcement (DCA) for 3D Elevation Program (3DEP)
3DEP-C: Request for Project Planning Estimate
Submit form to [email protected], Email subject: URGENT – [State] [Last name of primary applicant] Request for 3DEP Project Planning Estimate (e.g., URGENT – VA Smith Request for 3DEP Project Planning Estimate)
A Project Planning Estimate will provide an estimate of project costs sufficient for project planning and partnership development. Full and final costs will be calculated if project submission is selected. Organization:
Date:
First Name:
Last Name:
Email Address:
Phone:
(
)
-
Project Title:
300 characters maximum
GEOGRAPHIC EXTENT OF PROJECT AND COORDINATE REFERENCE SYSTEM (CRS)
State(s):
Geographic Extent:
☐
County(ies)
Please specify:
☐
Watershed
Please specify:
☐
Other
Please specify:
Project GIS File: A vector GIS file defining the location and coverage area of your project is required to develop the project planning estimate. Your project area must be represented by a polygon in shapefile, GeoPackage, or KML/KMZ format. Note: The minimum shapefile components required are: .shp, .sbx, .dbf, .prj Acknowledgement
required; please read
and check box
☐
A project vector GIS file has been submitted with this request for a project planning estimate.
3DEP Defined The project shapefile, GeoPackage, or KML/KMZ file must be expanded to add Project Area: a 100-meter buffer to comply with the Defined Project Boundary (DPA) of the 3DEP Lidar Base Specification. See Form 3DEP-B for instructions for creating 3DEP project boundaries.
Acknowledgement
required; please read
and check box
☐
The project vector GIS file has been expanded by 100-meters.
FY27 3DEP-C: Request for Project Planning Estimate
U.S. Geological Survey
3D National Topography Model Data Collaboration Announcement (DCA) for 3D Elevation Program (3DEP)
Coordinate
Reference System:
Square Miles:
DATA ACQUISITION TIMELINE AND CONDITIONS
Data Acquisition
Timeline:
☐
Spring 2027
Select only one option
☐
Fall 2027 / Winter 2028
☐
Other:
☐
Leaf-On
☐
Leaf-Off
☐
Coastal tide coordination
Data Acquisition
Conditions:
Note: If checked, applicant will be contacted by GPSC Commercial Partnership Team (CPT) staff to discuss your requirements.
☐
U.S. Forest Service guaranteed 50% sidelap
DATA SPECIFICATION
Data must adhere to the most current 3DEP Lidar Base Specification (https://www.usgs.gov/3dep/lidarspec). In addition to the requirements outlined in the 3DEP Lidar Base
The beginning of the document. Download the full file to read on.
Other documents in this bid
- 3DNTM DCA Broad Agency Announcement Program Announcement 1
- FY27 DCA - DCA Project Summary Form v1 1
- FY27 DCA - Instructions for Creating 3DEP Defined Project Area and Tile Delivery Scheme 1
- FY27 DCA - Validation of Proposed Funding Partners 1
- FY27 DCA -3DEP Data Validation Timeline 1
- FY27 DCA - DCA Project Summary Form v1 1
- FY27 DCA - Instructions for Creating 3DHP Project Boundaries 1
- FY27 DCA - Request for Planning Project Estimate 1
- FY27 DCA - Validation of Proposed Funding Partners 1
- FY27 DCA - 3DHP Data Validation Timeline 1