Home / Government Requirement for Advanced Power and Energy (GRAPE) / Document

GRAPE CALL 0002 Amendment 3 Questions and Answers

Updated

A PDF document (140 KB) attached to Government Requirement for Advanced Power and Energy (GRAPE), from the Department of the Air Force. Due Dec 31, 2027, 12:00 PM (UTC-5).

File name: GRAPE CALL 0002_Amend 03_QandA.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Advanced Research Announcement (ARA): CALL 002
(Amendment -03)
NAICS Code: The NAICS Code for this acquisition is 541715 and the small business size is 1,000 employees.
Federal Agency Name: Air Force Research Laboratory, AFRL/RXT Materials and Manufacturing Directorate, Energy Office
ARA Title: Energy Office – Government Requirement for Advanced Power and Energy (GRAPE)

ARA Type: CALL 002 – AMENDMENT -03; QUESTION/ANSWERS

ARA Number: FA8650-18-S-5008

SOO
2.5
A-2
Regardless of the outcome of final acceptance (i.e.,
remaining in place or equipment removal), will the Government please confirm that at the time of disposition the Government will be the Owner of Record for all materials and equipment to be removed?
RESPONSE: The Government will not necessarily be “Owner of Record” prior to the conclusion of the demonstration. The materials, equipment, and vehicles will likely be procured, or leased, and maintained, by the contractor during the contract. With that said, the materials, equipment, and vehicles will likely have been paid for with government contract funds. The government will not be “owning and maintaining” materials, equipment, and vehicles acquired during this contract, prior to the conclusion of the demonstration. After the conclusion of the demonstration, before the contract end, a decision will be made if the government will take ownership or the contractor shall remove/dispose as stated on page A-2, paragraph 2.5, “At the conclusion of the demonstration items associated with this contract will either be transferred to the government as real property and equipment or removed and /or disposed of. “ SOO
A-7
With respect to the Special Instructions, other than
covering the procurement costs for the equipment, what limits of liability and other insurance are required?
RESPONSE: This is a design, fabricate, and demonstration activity…as stated on page A-7, paragraph 12, “contractor is responsible for insurance covering equipment, vehicle, materials, and components throughout contract execution. Contractor is not responsible for equipment, vehicle, materials, and components when being operated by government personnel.” Basically the contractor is responsible for getting insurance to cover everything that could go wrong in the design, fabrication, AND demonstration, which the contractor is overseeing, throughout the duration of the contract – to include being responsible for repairing damages caused during/by this fabrication/installation/demonstration activity ( if the contractor is at fault). The second

The beginning of the document. Download the full file to read on.

Other documents in this bid