Greenhouse Statement of Work Rev3 2026-08-03
Updated
A Word document (45 KB) attached to IE181 - WHS Greenhouse Construction, from the Bureau of Indian Affairs. Due Nov 19, 2026, 12:00 PM (UTC-7).
File name: A01_-_Greenhouse_SOW_Rev3_2026-08-03.docx
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK
For Design and Build of Educational Greenhouse Facility with Environmental Control Systems Wingate High School
Roots to Rise: Revitalizing Indigenous Agriculture Through Education October 15, 2025 (Revised August 3, 2026)
1.0 OVERVIEW OF THE PROJECT
1.1 GENERAL PROJECT INFORMATION
The Bureau of Indian Education (BIE), Wingate High School requires procurement and delivery services for a complete educational greenhouse facility with integrated environmental control systems located at 1737 Shush Dr, Fort Wingate, NM 87316.
1.2 PURPOSE
This Statement of Work (SOW) describes the requirements for procurement, delivery, foundation installation, utility connections, assembly, and installation of a complete greenhouse facility under the "Roots to Rise: Revitalizing Indigenous Agriculture Through Education" project, funded by the Native American Agriculture Fund (NAAF). The greenhouse will serve as a "living classroom" for Indigenous students to gain hands-on agricultural experience.
1.3 PROJECT SCOPE
This procurement is set aside exclusively for Indian Economic Enterprises (IEEs) and Indian Small Business Economic Enterprises (ISBEEs) in accordance with the Buy Indian Act (25 U.S.C. § 47) and 48 CFR Subpart 1480.6. The Contractor shall provide:
Complete greenhouse structure and frame system
Glazing system with UV protection
Access doors (one double, one single)
Ventilation systems (exhaust fans, evaporative cooling, motorized shutters) Environmental control system (iGrow 800)
Heating system (two gas-fired unit heaters)
Air circulation system (six HAF fans)
All electrical components
Concrete foundation installation with anchor bolts
Complete utility connections (electrical, water, and gas services) Complete assembly and installation of all greenhouse systems Comprehensive documentation package
Training and technical support during startup
One-year warranty service
1.4 DEFINITIONS/ACRONYMS
"Owner" is BIE, Wingate High School
Acronyms:
ADAABAAG - Americans with Disabilities Act and Architectural Barriers Act Accessibility Guidelines A-E - Architectural and/or Engineering firm
AHJ - Authority Having Jurisdiction
BIA - Bureau of Indian Affairs
BIE - Bureau of Indian Education
CO - Contracting Officer
COR - Contracting Officer's Representative
DSRM - Division of Safety and Risk Management (AHJ, Albuquerque, NM) FOB - Free on Board
IEE - Indian Economic Enterprise
ISBEE - Indian Small Business Economic Enterprise
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Cover Page Texan Greenhouse Package
- Foundation Plan Texan Greenhouse Package
- Equipment Plan Texan Greenhouse Package
- Elevations Texan Greenhouse Package
- Electrical Plan Texan Greenhouse Package
- Mechanical Plan Texan Greenhouse Package
- Bench Plan Texan Greenhouse Package
- Irrigation Plan Texan Greenhouse Package
- DIAR 1452 280-2 Supplement
- Request for Proposals COVER SHEET - ISBEE Set-aside - Greenhouse
- Statement and Acknowledgement Form (Subcontracting)
- Payment Bond Form