Statement and Acknowledgement Form (Subcontracting)
Updated
A PDF document (564 KB) attached to IE181 - WHS Greenhouse Construction, from the Bureau of Indian Affairs. Due Nov 19, 2026, 12:00 PM (UTC-7).
File name: SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf
The full file is for paid members, or buy this bid alone.
Preview
OMB Control Number: 9000-0014
Expiration Date: 1/31/2021
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0014. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.
STATEMENT AND ACKNOWLEDGMENT
PART I - STATEMENT OF PRIME CONTRACTOR
2. DATE SUBCONTRACT
AWARDED
1. PRIME CONTRACT NUMBER
3. SUBCONTRACT NUMBER
4. PRIME CONTRACTOR
5. SUBCONTRACTOR
a. NAME
a. NAME
b. STREET ADDRESS
b. STREET ADDRESS
c. CITY
6. The prime contract
does,
Overtime Compensation."
d. STATE e. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
does not contain the clause entitled "Contract Work Hours and Safety Standards Act --
7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in item 5 by the following firm:
a. NAME OF AWARDING FIRM
b. DESCRIPTION OF WORK BY SUBCONTRACTOR
8. PROJECT
10a. NAME OF PERSON SIGNING
9. LOCATION
11. BY (Signature)
12. DATE SIGNED
10b. TITLE OF PERSON SIGNING
PART II - ACKNOWLEDGMENT OF SUBCONTRACTOR
13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract: Construction Wage Rate Requirements
Contract Work Hours and Safety Standards Act - Overtime Compensation Apprentices and Trainees
(If included in prime contract see Block 6)
Compliance with Copeland Act Requirements
Payrolls and Basic Records
Subcontracts (Labor Standards)
Withholding of Funds
Contract Termination - Debarment
Disputes Concerning Labor Standards
Certification of Eligibility
Compliance with Construction Wage Rate Requirements
and Related Regulations
14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY
A
C
B
D
15a. NAME OF PERSON SIGNING
16. BY (Signature)
17. DATE SIGNED
15b. TITLE OF PERSON SIGNING
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1413 (REV. 4/2013)
Prescribed by GSA/FAR (48 CFR) 53.222(e)
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Cover Page Texan Greenhouse Package
- Foundation Plan Texan Greenhouse Package
- Equipment Plan Texan Greenhouse Package
- Elevations Texan Greenhouse Package
- Electrical Plan Texan Greenhouse Package
- Mechanical Plan Texan Greenhouse Package
- Bench Plan Texan Greenhouse Package
- Irrigation Plan Texan Greenhouse Package
- Greenhouse Statement of Work Rev3 2026-08-03
- DIAR 1452 280-2 Supplement
- IA - IEE Representation Form
- Request for Proposals COVER SHEET - ISBEE Set-aside - Greenhouse