Foundation Plan Texan Greenhouse Package
Updated
A PDF document (345 KB) attached to IE181 - WHS Greenhouse Construction, from the Bureau of Indian Affairs. Due Nov 19, 2026, 12:00 PM (UTC-7).
File name: 002_Foundation_Plan_Texan_Greenhouse_Package.pdf
The full file is for paid members, or buy this bid alone.
Preview
Submitted For:
Submitted On:
Rev. Desc
Distribution
4"Ø G.H. COLUMN
(BASE PLATE OPTIONAL)
NOTE
Greenhouse equipment drawings are for
equipment layout only. Please refer to the
manufactures installation instructions and prints
for the installation of the greenhouse frame and
covering.
FOUNDATION PLAN
Scale: 3 8" = 1' - 0"
8'-3 5 8"
41'-6" CENTER TO CENTER OF COLUMNS
42'-512" OUT TO OUT OF CONCRETE PAD
24" DIA. PIER FOOTING
G
12'-0"
72'-0" CENTER TO CENTER OF COLUMNS
Greenhouse
Megastore
70 Eastgate Drive
Danville, IL 61834
Phone: 217-709-1832
greenhousemegastore.com
72'-1012" OUT TO OUT OF CONCRETE PAD
POLYCARBONATE
COVERING
U-CHANNEL AND
TERMINATION ANGLE
4" COLUMN
GIRT
COLUMN WELDED
BASE PLATE
POLYCARBONATE
COVERING
4" COLUMN
GIRT
Product:
BACK FILL
BACK FILL
Texan Package
Customer:
DRILL-IN WEDGE
ANCHORS
CONCRETE PIER FOOTING
(PER MANUFACTURE
REQUIREMENTS)
WET SET POST TO
REQUIRED DEPTH
CONCRETE PIER FOOTING
(PER MANUFACTURE
REQUIREMENTS)
Drawn By:
JBB
Checked By:
Optional: BASE PLATE ATTACHMENT
STANDARD PIER FOOTING
Page No.:
of:
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Cover Page Texan Greenhouse Package
- Equipment Plan Texan Greenhouse Package
- Elevations Texan Greenhouse Package
- Electrical Plan Texan Greenhouse Package
- Mechanical Plan Texan Greenhouse Package
- Bench Plan Texan Greenhouse Package
- Irrigation Plan Texan Greenhouse Package
- Greenhouse Statement of Work Rev3 2026-08-03
- DIAR 1452 280-2 Supplement
- IA - IEE Representation Form
- Request for Proposals COVER SHEET - ISBEE Set-aside - Greenhouse
- Statement and Acknowledgement Form (Subcontracting)