Home / IE181 - WHS Greenhouse Construction / Document

Foundation Plan Texan Greenhouse Package

Updated

A PDF document (345 KB) attached to IE181 - WHS Greenhouse Construction, from the Bureau of Indian Affairs. Due Nov 19, 2026, 12:00 PM (UTC-7).

File name: 002_Foundation_Plan_Texan_Greenhouse_Package.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Submitted For:

Submitted On:

Rev. Desc

Distribution

4"Ø G.H. COLUMN

(BASE PLATE OPTIONAL)

NOTE

Greenhouse equipment drawings are for
equipment layout only. Please refer to the
manufactures installation instructions and prints
for the installation of the greenhouse frame and
covering.

FOUNDATION PLAN

Scale: 3 8" = 1' - 0"

8'-3 5 8"

41'-6" CENTER TO CENTER OF COLUMNS

42'-512" OUT TO OUT OF CONCRETE PAD

24" DIA. PIER FOOTING

G

12'-0"

72'-0" CENTER TO CENTER OF COLUMNS

Greenhouse
Megastore

70 Eastgate Drive

Danville, IL 61834
Phone: 217-709-1832
greenhousemegastore.com

72'-1012" OUT TO OUT OF CONCRETE PAD

POLYCARBONATE

COVERING

U-CHANNEL AND

TERMINATION ANGLE

4" COLUMN

GIRT

COLUMN WELDED

BASE PLATE

POLYCARBONATE

COVERING

4" COLUMN

GIRT

Product:

BACK FILL

BACK FILL

Texan Package

Customer:

DRILL-IN WEDGE

ANCHORS

CONCRETE PIER FOOTING

(PER MANUFACTURE

REQUIREMENTS)

WET SET POST TO

REQUIRED DEPTH

CONCRETE PIER FOOTING

(PER MANUFACTURE

REQUIREMENTS)

Drawn By:

JBB

Checked By:

Optional: BASE PLATE ATTACHMENT

STANDARD PIER FOOTING

Page No.:

of:

The beginning of the document. Download the full file to read on.

Other documents in this bid