SHEET

PROJECT

RECOMMENDED

WINGWALLS FOR CONCRETE HEADWALLS

WINGWALL SKEWS

DIMENSIONS, REINFORCING STEEL AND CONCRETE TABLE OF QUANTITIES

5.00

45° WINGWALL SKEW

W

CONC.

STEEL

W

CONC.

STEEL

W

CONC.

STEEL

W

CONC.

STEEL

W

CONC.

STEEL

FEET

CUYD

LB

FEET

CUYD

LB

FEET

CUYD

LB

FEET

CUYD

LB

FEET

CUYD

LB

6.00

2.81

6.00

WINGWALL

60° WINGWALL SKEW

2.78

6.00

2.76

6.00

2.74

6.00

2.73

5.25

6.00

2.86

6.00

2.82

6.00

2.80

6.00

2.78

6.75

3.06

5.50

6.25

2.90

6.00

2.86

6.00

2.84

6.00

2.82

7.50

3.39

5.75

7.00

2.94

6.00

2.90

6.00

2.87

6.00

2.85

8.25

3.74

6.00

7.50

2.98

6.00

2.94

6.00

2.91

6.50

3.09

9.00

4.09

6.25

8.25

3.02

6.00

2.98

6.00

2.95

7.00

3.34

9.75

4.45

6.50

8.75

3.06

6.00

3.02

6.25

3.09

7.50

3.59

10.50

4.81

6.75

9.50

3.11

6.00

3.06

6.50

3.24

8.00

3.84

11.25

5.18

7.00

10.00

3.15

6.25

3.21

7.00

3.49

8.50

4.10

12.00

5.56

NOTE:

PIPE SKEW

0°

15°

30°

45°

45°

45°

60°

60°

45°

30°

15°

0°

45°

30°

15°

0°

45°

45°

60°

60°

1. Chamfer all exposed edges 4 inch
and finish all exposed surfaces with a Class 1
ordinary finish.
2. Reinforcing steel clearance is 2 inches unless otherwise noted. 3. For skew angles shown in table, the length W and quantities for wingwalls are computed for a 1V:1.5H side slope.
For 1V:2H or 1V:2.5H slopes compute length W with the
following equation:
W = D/2 × slope × secant (wingwall skew angle)

#4 Bars o.f.

b.f.

FEET

30° WINGWALL SKEW

at 15"

INCH

H

15° WINGWALL SKEW

#4 Bars

D

0° WINGWALL SKEW

NUMBER

Minimum W not less than 6 feet.

#5 Bars f.f.

4. Quantities shown in table are for one wingwall only.

#4 Bars
top & bottom

For lengths W not shown in table, approximate the
quantities by multiplying the quantities for 0° skew and

#4 Bars at
equal spacing
15" max.

3" Clr.

a given height H by the factor: 1 + [(W-6.0) × 0.14].
5. See Standards 601-1 and 601-2 for headwall and
slope paving dimensions.

top & bottom

6. Final quantities will be determined by using the tables on this drawing.

SECTION A-A

"

7. Do not order materials until the length, skew angle, and

#4 Bars top (typ.)

#4 Bars top (typ.)

slope bevel in the field have been approved.

bottom reinforcement

W

joint filler (typ.)

not shown

"

2" min. preformed

Abbreviations:

Field bend reinforcing

f.f. = fill face

steel as necessary.

Skew angle of wingwall

o.f. = other face
b.f. = both faces

L

#4 Bars b.f.
#5 Bars at equal spacing
12" max. f.f.

PLAN

'0
"

W
12"

Skew angle of wingwall is

A

b.f.

not shown

to centerline roadway.

L

C Pipe culvert

Outlet

H

4'-0"

18"

18"

D

Wingwall

measured from perpendicular

#4 Bars

12"

"

LRoadway

C

PLAN

'2
"
"
'0
"

[Std 601-3]
c:\pw-work\d0147408\Std601-3.dgn

The beginning of the document. Download the full file to read on.

Other documents in this bid