MISC Request for Proposals Request for Information Log Answered 11 16 0002
Updated
A PDF document (119 KB) attached to FAIR Route 3 - 96-inch CMP Replacement Project, from the Bureau of Indian Affairs. Due Nov 18, 2026, 5:00 PM (UTC-5).
File name: B12_MISC_RFP_RFI_Log_Answered_11_16_26-REV_0002.pdf
The full file is for paid members, or buy this bid alone.
Preview
Questions and Answers Log
140A1627Q0105, FAIR Route 3 - 96-in CMP Replacement Project Number
Date Received
11/10/2026
11/10/2026
11/10/2026
11/10/2026
11/10/2026
11/10/2026
11/10/2026
11/10/2026
11/10/2026
11/10/2026
11/10/2026
11/11/2026
11/11/2026
11/11/2026
11/11/2026
11/11/2026
11/11/2026
11/11/2026
11/11/2026
Question
Please provide the referenced structural concrete headwall details, existing culvert drawings, and any available roadway cross sections.
See attached Drawings.
Answer
Does the stated 20-foot burial depth refer to cover above the pipe crown or the depth Above the pipe crown. The depth would be 28 feet to the invert of the to the pipe invert?
corrugated metal pipe (CMP).
Are geotechnical reports, boring logs, or information regarding rock and groundwater conditions available?
Will complete closure of FAIR Route 3 be authorized during construction, or must traffic be maintained?
Are temporary water diversion or dewatering measures required, and are design criteria available?
Please identify the required CMP gauge, corrugation profile, coating, and structural design requirements.
Is excavated material permitted to be reused as structural backfill if testing demonstrates compliance?
Are there designated disposal areas, approved borrow sources, or other material restrictions?
Please confirm whether the project is firm-fixed-price, as the Statement of Work references reimbursement of allowable costs.
Please clarify whether attendance at the November 10 site visit is mandatory for quotation eligibility and whether a site visit report or photographs will be provided.
No geotechnical data is available, since this was designed and constructed in 1969. No design required for Road Maintenance. Yes, it is closed now and will remain closed until the CMP is replaced with the same structure.
No, there is no room to have a diversion of the drainage. It is only running during storm events.
Conform to the FP-14, Section 707, and "galvanized coated" will be required for a 96" CMP. It is the Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects. Yes, existing material can be reused as structural backfill. Since material has been washed out since July, borrow material will be required to complete the backfill.
The COR will contact the agency superintendent for borrow sources. This item was not needed when the original assesssment was completed in July 2026. The COR will notify you of the locations
The beginning of the document. Download the full file to read on.