Industry Day Drawing Set
Updated
A PDF document (14.7 MB) attached to Winfield Locks and Dam Major Rehab Industry Day, from the Department of the Army. Due Nov 1, 2026, 12:00 PM (UTC-4).
File name: Industry Day Drawing Set.pdf
The full file is for paid members, or buy this bid alone.
Preview
P
N
DATE
US Army Corps
of Engineers ®
US Army Corps
of Engineers ®
DISTRICT / INLAND NAVIGATION DESIGN CENTER
M
DESCRIPTION
L
HUNTINGTON DISTRICT
WINFIELD LOCKS AND DAM
MAJOR REHABILITATION
DESIGNED BY:
ISSUE DATE:
Designer
MONTH-YEAR
DRAWN BY:
SOLICITATION NO.:
Author
CHECKED BY:
CONTRACT NO.:
Checker
SUBMITTED BY:
Approver
SIZE:
PLOT DATE:
9/18/2026 2:23:20 PM
ANSI D
MARK
K
J
H
U.S. ARMY CORPS OF ENGINEERS
HUNTINGTON DISTRICT
502 8TH STREET
HUNTINGTON, WV 25701
G
F
E
SUBMITTED BY:
TECHNICAL LEAD, UPPER OHIO NAVIGATION PROJECT
SUBMITTED BY:
CHIEF, STRUCTURAL DESIGN SECTION
APPROVED BY:
DIRECTOR, INDC
C
B
A
CONTRACT NO.:
ISSUE DATE:
MONTH-YEAR
THIS PROJECT WAS DESIGNED BY THE PITTSBURGH
DISTRICT, NASHVILLE DISTRICT, LOUISVILLE DISTRICT,
HUNTINGTON DISTRICT, AND DETROIT DISTRICT OF THE
U.S. ARMY CORPS OF ENGINEERS IN COORDINATION
WITH THE INLAND NAVIGATION DESIGN CENTER. THE
INITIALS OR SIGNATURES AND REGISTRATION
DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE
PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR
EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
SHEET ID
G-001
30% DESIGN
APPROVAL RECOMMENDED BY:
CHIEF, CONSTRUCTION DIVISION
GENERAL
COVERSHEET
APPROVAL RECOMMENDED BY:
CHIEF, ENGINEERING DIVISION
HUNTINGTON DISTRICT
WINFIELD LOCKS AND DAM
MAJOR REHABILITATION
D
GENERAL SHEET NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR MARKING THE
BOUNDARIES OF ALL CWL AND LWL AREAS AS NECCASSARY
TO PREVENT UNAUTHORIZED WORK OR ACCESS TO THESE
AREAS. IT IS THE CONTRACTORS RESPONSIBILITY TO
ENFORCE LWL RESTRICTIONS AGAINST UNAUTHORIZED USE
BY THE CONTRACTOR'S PERSONNEL, THE PUBLIC, AND
OTHER CONTRACTORS. AT A MINIMUM, 6-FT CHAINLINK
FENCE WITH BARBWIRE TOP TREATMENT MUST BE USED IN
LWL'S WHICH ARE OPEN TO THE PUBLIC.
RO
EV
EL
TB
LV
2. USE OF LOCK ROAD OR ANY ADDITIONAL AREA MUST BE
APPROVED IN WRITING BY THE COR.
D
3. THE GOVERNMENT SECURITY ACCESS GATE MUST
PROVIDE GOVERNMENT ACCESS TO THE LOCK AND DAM SITE
AND ASSOCIATED OPERATIONS BUILDINGS. "DO NOT" USE
THIS GATE ACCESS AS A PRIMARY CONSTRUCTION ACCESS.
AR
M
N
SEE NOTE 7
SEE NOTE 11
SEE NOTE 9
9. LIMITED ACCESS WALKING PATH MUST ONLY BE USED TO
ACCESS THE AREA WITHIN THE CWLs. NO STORAGE,
STAGING OF MATERIALS, OR PARKING OF ANY EQUIPMENT IS
PERMITTED WITHIN THESE LIMITS OF THE LWL's UNLESS
APPROVED IN WRITING BY THE COR.
CWL 3
SEE NOTE 9
H
10. FERC LIMITS DEFINES AEP'S AREA PER THE FERC
LICENSE AGREEMENT.
11. LWL 5 WILL BE USED FOR ACCESS AND RELOCATION OF
ON-SITE BULKHEADS, ACCESS TO THIS AREA MUST BE
REQUESTED FROM THE COR XX HOURS PRIOR TO ACCESS.
G
SHEET KEYNOTES
1. GATE ACCESS
2. GOVERNMENT SECURITY
GATE ACCESS
3. MITER GATE
4. EMERGENCY GATE
The beginning of the document. Download the full file to read on.