Home / Industry Day - USACE SPK Geotechnical Drilling and… / Document

Industry Day - Geotechnical Drilling and Laboratory Services MATOC

Updated

A PDF document (328 KB) attached to Industry Day - USACE SPK Geotechnical Drilling and Laboratory Services, from the Department of the Army. Due Dec 10, 2026, 1:00 PM (UTC-8).

File name: Industry Day - Geotechnical Drilling and Laboratory Services MATOC.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Special Notice: Virtual Industry Day

Event Schedule & Platform

Date of Event: December 10, 2026 (Thursday)

Time: 1:00 PM – 2:00 PM Pacific Standard Time (PST)

Location/Platform: Virtual via Microsoft Teams (see below for details)

Purpose of Event
The U.S. Army Corps of Engineers, Sacramento District (USACE-SPK) is pleased to announce a virtual Industry Day on December 10, 2026.
The purpose of this session is to provide industry partners with a comprehensive overview of the upcoming Geotechnical Drilling Multiple Award Task Order Contract (MATOC). The Government will present details regarding program requirements, anticipated geographic scope, proposed technical evaluation factors (such as specialized rig fleet inventory and AASHTO/USACE MTC laboratory accreditation standards), and the tentative acquisition milestone schedule.
USACE-SPK anticipates issuing a formal solicitation under NAICS 541360in February 2027., and highly encourage participation from regional small businesses, prospective joint venture partners, and specialty subcontractors who intend to compete. Scope of Work and Technical Capabilities
USACE-SPK seeks firms with the capabilities to provide comprehensive geotechnical drilling, cone penetrometer testing (CPT) services, and test-pit excavations utilizing backhoes and track hoes. The principal features of the work encompass soil drilling and sampling utilizing hollowstem flight augers, solid-stem flight augers, mud-rotary, air-rotary, and percussion drilling methods, including ODEX, Down-hole Casing Advance Systems, or other specialized percussion drilling systems. Contract requirements will also mandate sonic drilling and sampling, alongside rock core drilling and sampling of up to 6-inch diameter using wireline or conventional diamondimpregnated drill bits. Soil sampling operations will require standard penetrometers and other split-barrel samplers up to 3-inch-diameter, as well as undisturbed soil sampling using Shelby push tubes and Pitcher barrels with Pitcher tubes. Field operations will further include CPT testing, piezometer and inclinometer installations, hydraulic pressure testing associated with rock core drilling, and observation well installation and development, which includes pump, permeability, and percolation testing. Contractors will be responsible for generating all associated documentation, to include detailed drill logs, trench or test-pit logs, as-built diagrams for all instrumentation and

well installations, and percolation test records. Additionally, the contractor must occasionally

The beginning of the document. Download the full file to read on.