J-1 OKC Elevator - Amendment 1
Updated
A PDF document (319 KB) attached to 697DCK-26-R-00355: OKC ATCT Full-Service Elevator Maintenance, from the Federal Aviation Administration. Due Oct 26, 2026, 12:00 PM (UTC-5).
File name: J-1 OKC Elevator (PWS) - Amend 1.pdf
The full file is for paid members, or buy this bid alone.
Preview
FEDERAL AVIATION ADMINISTRATION
Performance Work Statement
Full Service Elevator Maintenance
1.
CONTRACT EFFORT REQUIRED
A. Minimum Level of Work. The Contractor must perform an assessment and take all steps and measures to provide a minimum elevator operational availability of 97% and no more than 4 unscheduled outages per quarter. The maintenance of the elevator plant shall be in accordance with the latest edition of American Society of Mechanical Engineers (ASME) A17.1 -Safety Code for Elevators and Escalators and (ASME) A18.1-Safety Standard for Platform lift and Stairway Chairlift. Throughout this document, this standard may be referred to as "the Code". The contractor must assume responsibility for full-service maintenance upon notice-to-proceed for commencement of maintenance contract.
B. Personnel Requirements. The Contractor must provide qualified elevator mechanics, work crews, and supervisory personnel in such numbers, places, and times as may be required to fully meet the contract requirements. C. Working Hours. All scheduled contract work must be accomplished during normal hours (7:00am-4:30pm Monday-Friday) and reaffirmed by the Contracting Officer (CO) and Contracting Officer’s Representative (COR). The Contractor's proposal must include responding to unscheduled and/or emergency service calls 7 days per week, 24 hours per day as part of the contract price.
D. Subcontracts. All subcontracts must be in writing and conform to all the provisions of this contract. The Contracting Officer (CO) may request to approve in writing the use of subcontractors before they perform any work under this contract. E. Contractor Conduct. All persons furnished by the Contractor, including subcontractors, are the sole responsibility of the Contractor. The Contractor must be responsible for their compliance with all applicable laws, rules, regulations and security clearances.
F. Account Representative. The Contractor must assign an individual to work directly with the Contracting Officer. This individual will be responsible for all matters pertaining to the contract requirements.
2.
SCOPE OF WORK
A. Acceptance of Existing Equipment.
(1) In accordance with standard elevator industry practice, this is a full-service maintenance contract. The Contractor must inspect, maintain, repair, test, and clean all of the elevators and the elevator equipment.
(2) The Contractor must accept these elevators "as is". Obsolescence is not
recognized in the terms of this contract. Any parts that are obsolete and cannot
The beginning of the document. Download the full file to read on.