DEPARTMENT OF THE NAVY

FDRMC NAPLES

FPO,

AE

USS RAFAEL PERALTA

(DDG 115)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER:

NAPL-009-27

SHIP CHARACTERISTICS

LENGTH OVERALL

513 FEET

0 INCHES

MAX. BEAM AT DESIGN WATERLINE

0 FEET

0 INCHES

EXTREME BEAM INCLUDING APPENDAGES

0 FEET

0 INCHES

DRAFT (MAX. NAVIGABLE)

(FWD.)

0 FEET

0 INCHES

DRAFT (MAX. NAVIGABLE)

(AFT.)

0 FEET

0 INCHES

LONG TON

9,217

LONG TON

0 FEET

0 INCHES

LIGHT DISPLACEMENT

FULL LOAD DISPLACEMENT

HEIGHT OF MAST ABOVE DESIGN WATERLINE

INCLUDES ALL CHANGES THROUGH 10/23/2026

NAPL-009-27

SHIP: USS RAFAEL PERALTA (DDG 115)

INDEX

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT. CATEGORY I. FY-27 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE. ITEM_NO.

TITLE

CHANGE DATE

CHANGE

009-001

General Criteria; accomplish

10/01/2024

Original

009-002

Environmental Compliance Report for Material Usage; accomplish

10/01/2024

Original

009-003

Toxic and Hazardous Substance; control

10/01/2024

Original

009-004

Quality Management System; provide

10/01/2024

Original

009-005

Temporary Access; accomplish

11/18/2024

CH-1

009-006

10/01/2024

Original

009-007

Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish
Confined Space Entry, and Certification; accomplish

10/01/2024

Original

009-008

Shipboard Fire Protection and Fire Prevention; accomplish

10/01/2024

Original

009-010

Asbestos-Containing Material (ACM); control

10/01/2024

Original

009-018

Mine Warfare Ships Magnetic Material; control

10/01/2024

Original

009-019

Provisioning Technical Documentation (PTD); provide

10/01/2024

Original

009-020

Government Property; control

10/01/2024

Original

009-021

Alteration Verification, Logistic and Technical Data; provide

10/01/2024

Original

009-023

Interference; remove and install

11/18/2024

CH-1

009-024

Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish

10/01/2024

Original

009-034

Fire Protection of Unmanned Vessel at Contractor Facility; accomplish

10/01/2024

Original

009-039

10/01/2024

Original

10/01/2024

Original

009-060

Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish
Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide
Schedule and Associated Report for CNO Availability; provide and manage

10/01/2024

Original

009-061

Shipboard Use of Fluorocarbons; control

10/01/2024

Original

009-067

Integrated Total Ship Testing; manage

10/01/2024

Original

009-068

Availability Work Certification (AWC) Data for Chief of Naval Operations (CNO)