DEPARTMENT OF THE NAVY
FDRMC NAPLES
FPO,
AE
USS RAFAEL PERALTA
(DDG 115)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER:
NAPL-009-27
SHIP CHARACTERISTICS
LENGTH OVERALL
513 FEET
0 INCHES
MAX. BEAM AT DESIGN WATERLINE
0 FEET
0 INCHES
EXTREME BEAM INCLUDING APPENDAGES
0 FEET
0 INCHES
DRAFT (MAX. NAVIGABLE)
(FWD.)
0 FEET
0 INCHES
DRAFT (MAX. NAVIGABLE)
(AFT.)
0 FEET
0 INCHES
LONG TON
9,217
LONG TON
0 FEET
0 INCHES
LIGHT DISPLACEMENT
FULL LOAD DISPLACEMENT
HEIGHT OF MAST ABOVE DESIGN WATERLINE
INCLUDES ALL CHANGES THROUGH 10/23/2026
NAPL-009-27
SHIP: USS RAFAEL PERALTA (DDG 115)
INDEX
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT. CATEGORY I. FY-27 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE. ITEM_NO.
TITLE
CHANGE DATE
CHANGE
009-001
General Criteria; accomplish
10/01/2024
Original
009-002
Environmental Compliance Report for Material Usage; accomplish
10/01/2024
Original
009-003
Toxic and Hazardous Substance; control
10/01/2024
Original
009-004
Quality Management System; provide
10/01/2024
Original
009-005
Temporary Access; accomplish
11/18/2024
CH-1
009-006
10/01/2024
Original
009-007
Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish
Confined Space Entry, and Certification; accomplish
10/01/2024
Original
009-008
Shipboard Fire Protection and Fire Prevention; accomplish
10/01/2024
Original
009-010
Asbestos-Containing Material (ACM); control
10/01/2024
Original
009-018
Mine Warfare Ships Magnetic Material; control
10/01/2024
Original
009-019
Provisioning Technical Documentation (PTD); provide
10/01/2024
Original
009-020
Government Property; control
10/01/2024
Original
009-021
Alteration Verification, Logistic and Technical Data; provide
10/01/2024
Original
009-023
Interference; remove and install
11/18/2024
CH-1
009-024
Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish
10/01/2024
Original
009-034
Fire Protection of Unmanned Vessel at Contractor Facility; accomplish
10/01/2024
Original
009-039
10/01/2024
Original
10/01/2024
Original
009-060
Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish
Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide
Schedule and Associated Report for CNO Availability; provide and manage
10/01/2024
Original
009-061
Shipboard Use of Fluorocarbons; control
10/01/2024
Original
009-067
Integrated Total Ship Testing; manage
10/01/2024
Original
009-068
Availability Work Certification (AWC) Data for Chief of Naval Operations (CNO)