Home / One Acquisition Solution for Integrated Services Plus… / Document

J.P-10 OASIS Individual Model Subcontracting Plan

Updated

A PDF document (487 KB) attached to One Acquisition Solution for Integrated Services Plus (OASIS+) Unrestricted Continuously Open Solicitation, from the Federal Acquisition Service. Due Jan 11, 2027, 4:00 PM (UTC-5).

File name: J.P-10 OASIS+ Individual Model Subcontracting Plan.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

MODEL INDIVIDUAL SUBCONTRACTING PLAN

INSTRUCTIONAL REMINDERS

Remove these instructional pages before submitting your completed subcontracting plan to the Contracting Officer
An individual subcontracting plan:
Applies to a specific federal agency (GSA) single contract Covers the entire contract period, including all options whether exercised or not Contains goals that are based on the offeror’s planned subcontracting (and purchasing) in support of the specific contract
●​ Indirect costs incurred for common or joint purposes may be included in the plan, allocated on a prorated basis to the contract. If included in the plan, indirect costs must be included in the reports after award.
●​ For contracts with option periods, the individual plan will include: ●​ separate goals for the base period
●​ separate goals for each option period
●​ a sum total of all periods for the entire contract term ●​
●​
●​

NOTE: The Model Individual Subcontracting Plan template is a tool contractors may choose to use when preparing their Individual subcontracting plans. The Model Individual Subcontracting plan It is not mandatory for contractors to use this tool, they need only to ensure they have included all statutory elements.

The Model Individual Subcontracting plan:
Is NOT a fill-in-the-blank form
Does not replace the FAR requirements listed in clause 52.219-9 Small Business Subcontracting Plan (NOV 2025)
●​ Reflects objectives GSA encourages contractors to adopt. Contractors are not required to use GSA goals as their own.
●​
●​

REMINDER: WHEN SELECTING INDIVIDUAL SUBCONTRACTING

PLAN TYPE, UNDER A MULTIPLE AWARD ID/IQ CONTRACT USED BY

MORE THAN ONE AGENCY, CONTRACTORS ARE REQUIRED TO

REPORT SMALL BUSINESS SUBCONTRACTING FOR EACH

FUNDING- AGENCY- ISSUED ORDER IN THE GOVERNMENT-WIDE

ELECTRONIC SUBCONTRACTING REPORTING SYSTEM (ESRS)

AFTER AWARD1.

FAR 52.219-9 (d)(10)(iii) (NOV 2025)

Updated December 2025

Use the Individual Subcontracting Plan Template:
For a new contract award whose total value, including options, exceeds the subcontracting plan threshold listed in FAR 19.109(a)(1) (GSA Class Deviation RFO-2025-19).
●​ For existing contracts when:
o​ either a contract modification causes the value of the contract to exceed the threshold required for a subcontracting plan, OR
o​ as a result of size changes due to re-representation (FAR 52.219-28 (NOV 2025)). When a subcontracting plan is required, the plan shall cover the remaining periods of the contract.2

The beginning of the document. Download the full file to read on.

Other documents in this bid