List Of Deliverables Draft
Updated
A PDF document (848 KB) attached to USCG - Response Boat, Small Third Generation (RB-S III), from the US Coast Guard.
File name: List_Of_Deliverables_Draft.pdf
The full file is for paid members, or buy this bid alone.
Preview
Response Boat -Small Third Generation (RB-S III)
70Z0232##########
RB-S III
List of Deliverables
SOW / SPEC Ref.
N/A
040-2.1.2
040-2.4
Deliverable Description
Offeror Proposal – Volume I
– Mission Effectiveness and
Supportability including all
appendices
Formal Meeting Agenda
Milestone
Contract Award
To
KO
Required Delivery
At Award
Pricing Sheet
NSP
KO
Formal meeting agenda
seven days prior to the
formal meeting
X001
KO
Formal meeting minutes two
days after conclusion of the
formal meeting
X001
KO
Monthly for the first 12
months; Quarterly thereafter,
at the end of March, June,
September, and December
• With the boat
• As needed with change(s)
to the configuration
tracked by hull prior to
Product Configuration
Baseline (PCB).
• With PCB
• 45 days Gov review
• 14 days after first review
comments received
X001
T
#
• Post Award Conference
• Open Hull Inspection
AF
• Acceptance Testing
• Post-Operational Test and
Evaluation Review.
• Follow-On Order Year Reviews
Formal Meeting Draft and
Final Meeting Minutes
040-4
Integrated Master Schedule
041-2
Initial Configuration Status
Accounting (CSA) Data
Files
Starting with acceptance of second boat
KO
Final Configuration Status
Accounting (CSA) Data
Files
PCB
KO
D
041-2
• Post Award Conference
• Open Hull Inspection
• Acceptance Testing
• Post-Operational Test and Evaluation
Review.
• Follow-On Order Year Reviews
Post Award Conference
R
040-2.1.2
040-2.4
Section C Attachment 4 List of Deliverable
X007 (OY2)
X007 (OY2)
Response Boat -Small Third Generation (RB-S III)
70Z0232##########
RB-S III
List of Deliverables
Deliverable Description
Revised CSA Data Files
041-4.3
Product Drawings for
Physical Configuration
Audit (PCA)
041-4.6
PCA Resolution Report
PCA
KO
041-5.1
Engineering Change
Installation Instructions
(ECII)
Configuration Status Report
(CSR)
Warranty Repair Plan
Warranty Book listing
warranty provided by the
contractor and all
commercial component
warranties
Hull Structure Construction
Documents
As needed
KO
With boats
KO
As needed
With boats
KO
• KO
• Boat
042-1.4
042-1.7
D
068-1.3
To
KO
Required Delivery
• Pre-PCB, soft copy, 14
days prior to initial hull(s).
• Post-PCB, soft copy, 14
days of approved ECP.
• 90 days prior to
• 45 days Gov review
• 14 days after first review
comments received
• Hard copy, at PCA.
30 days after USCG
provides PCA report to
Contractor
The beginning of the document. Download the full file to read on.