Home / USCG - Response Boat, Small Third Generation (RB-S III) / Document

Statement of Work RB-S III Draft

Updated

A PDF document (1.3 MB) attached to USCG - Response Boat, Small Third Generation (RB-S III), from the US Coast Guard.

File name: 1. SOW_RB-S_III_Draft.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

USCG Response Boat – Small Third Generation (RB-S III)

Draft Request for Proposal (RFP)

Department of Homeland Security (DHS)

United States Coast Guard (USCG)

AF
T

Response Boat - Small Third Generation

(RB-S III)

Draft Request for Proposal
(Draft RFP)

D

R

STATEMENT OF WORK

(SOW)

26 AUG 2026

Revision Orig

USCG Response Boat – Small Third Generation (RB-S III)

Draft Request for Proposal (RFP)

D

R

[ORIG] PROGRAM MANAGEMENT ----------------------------------------------------------------------------------------------- 3 [ORIG] CONFIGURATION MANAGEMENT (CM) ------------------------------------------------------------------------------ 5 [ORIG] WARRANTY ------------------------------------------------------------------------------------------------------------------- 8 [ORIG] IN-WATER DEMONSTRATION (IWD) --------------------------------------------------------------------------------- 10 [ORIG] CARE OF RB-S III DURING CONSTRUCTION AND TRIALS ------------------------------------------------------- 10 [ORIG] OPEN HULL INSPECTION (OHI) ---------------------------------------------------------------------------------------- 11 [ORIG] PRODUCTION SAFETY AND ACCIDENT PREVENTION ----------------------------------------------------------- 12 [ORIG] INTERIM CONTRACTOR LOGISTICS SUPPORT (ICLS) REQUIREMENTS ------------------------------------- 12 [ORIG] OPERATIONAL TESTING (OT) SUPPORT ----------------------------------------------------------------------------- 12 [ORIG] SUPPLY SUPPORT --------------------------------------------------------------------------------------------------------- 13 [ORIG] PACKAGING, HANDLING, STORAGE, AND TRANSPORTATION ----------------------------------------------- 17 [ORIG] TECHNICAL DATA PACKAGE (TDP) REQUIREMENTS ------------------------------------------------------------ 18 [ORIG] TECHNICAL MANUALS --------------------------------------------------------------------------------------------------- 26 [ORIG] CREW FAMILIARIZATION (FAM) -------------------------------------------------------------------------------------- 28 [ORIG] ACCEPTANCE TESTING (AT) FOR FIRST BOAT --------------------------------------------------------------------- 29 [ORIG] ACCEPTANCE TESTING (AT) FOR SECOND BOAT AND ONWARD -------------------------------------------- 29 [ORIG] CENTER OF GRAVITY REPORT ------------------------------------------------------------------------------------------ 34 [ORIG] ONE TIME TEST FOR SECOND BOAT --------------------------------------------------------------------------------- 34

The beginning of the document. Download the full file to read on.

Other documents in this bid