LAKE TAHOE BASIN MANAGEMENT UNIT
PARKING LOT SNOW REMOVAL
WINTER 2025-2026
A. General
a. Project Scope
i. This project is for the periodic snow removal from three (3) administrative sites of the Lake Tahoe Basin Management Unit (LTBMU). The contractor shall be responsible for removing snow on asphalt and concrete pavement using both plow methods and rotary snow removal methods. The Contractor shall furnish all necessary labor, equipment, materials, and supplies necessary for the removal of snow as described in the contract.
b. Project Locations
i. Site 1: LTBMU Forest Supervisor's Office located at 35 College Drive, South Lake Tahoe, CA.
ii. Site 2: LTBMU Meyers Work Center located at 3030 Highway 50 in Meyers CA. The site is located approximately 8 miles south of South Lake Tahoe.
iii. Site 3: LTBMU South Shore Estates Area. The site is located on the south shore of Lake Tahoe approximately 2.5 miles northwest of South Lake Tahoe and approximately 1/4 mile west of Camp Richardson Resort.
B. Execution
a. Snow Removal Requirements:
i. Site 1 - LTBMU Supervisor’s Office
1. Refer to Drawing 1 of 3, LTBMU Supervisor's Office for graphical layout of the area and description of areas
designated for snow removal.
2. Morning Snow Removal: Contractor shall remove all
accumulated snow from the designated roadways and
parking areas when a minimum of 4" of snow has fallen at the site. Contractor shall perform snow removal operations early enough in the morning to have all designated areas cleared of snow by 0630 hours.
3. The Contractor shall perform snow removal operations seven days a week.
4. Be careful of fence at west side parking lot, over the bank on Northwest side of building and the Gov. vehicle parking area fences.
5. Subsequent Daily Snow Removal: If during the day and after the initial morning snow removal operations, a minimum
snow fall of 6" has fallen by 1400 hours, the Contractor shall remove snow from the designated roadways and parking
areas so as to allow vehicles to enter and leave the site. ii. Site 2: LTBMU Meyers Work Center:
1. Refer to Drawing 2 of 3, LTBMU Meyers Work Center, for graphical layout of the area and description of areas
designated for snow removal.
2. The Contractor shall perform snow removal operations seven days a week.
3. Morning Snow Removal: Contractor shall remove all
accumulated snow from the designated roadways areas only when a minimum of 4" of snow has fallen at the site.