Market Intelligence Request Service Air System Revitalization S
Updated
A PDF document (175 KB) attached to Service Air System Revitalization, from the Department of the Air Force. Due Nov 25, 2026, 2:00 PM (UTC-6).
File name: Market Intelligence Request Service Air System Revitalization_S.pdf
The full file is for paid members, or buy this bid alone.
Preview
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS AIR FORCE TEST CENTER
EDWARDS AIR FORCE BASE CALIFORNIA
17 November 2026
MEMORANDUM FOR VENDORS UTILIZING NAICS CODE 333912: Air and Gas Compressor
Manufacturing
FROM: AFMC/AFTC/PZIA
100 Kindel Drive
Arnold AFB, TN 37389-1332
SUBJECT: Service Air System Revitalization – Market Intelligence Request The Government is currently in the market intelligence phase of this project, aimed at identifying qualified vendors who can meet the technical and regulatory requirements to deliver a fully operational, safe, energy-efficient, and modernized compressed air and dry air network. The scope of this initiative encompasses the engineering, system design, procurement, delivery, installation, integration, refurbishment, and commissioning of new and existing service air assets across three (3) primary facility locations. Submissions must explicitly state whether the respondent is currently an authorized IngersollRand distributor and seller. This is not a request for proposal, and an award is not guaranteed to be made. Information received is intended to help the Government determine the final acquisition approach. To help the Government assess your company's suitability, please provide concise responses to the following key questions: Technical Capabilities (Top 4):
1. Design a revitalized Service Air System: Describe your company’s experience in service air systems. Specifically, address your experience with service air systems in an industrial or test environment similar to Arnold Engineering Development Complex (AEDC). Outline your typical process for managing milestones such as Preliminary Design Reviews (PDR), Critical Design Reviews (CDR), and Readiness Reviews (RR).
2. Fabrication and Integration: Summarize your approach to developing a fully functional revitalized service air system, from design and fabrication to installation and testing. Outline your typical process for managing milestones.
3. Test and Integrate: Summarize your approach to testing and integrating the revitalized service air system to verify operation and performance. Outline your typical process for managing testing and commissioning of the service air system.
4. Data Deliverables: Describe the typical reports and data you provide for a project of this scope, including design documentation, test reports, training, operational and maintenance manuals. Give examples of key deliverables such as Operational Drawings (P&IDs, Schematics), Installation
The beginning of the document. Download the full file to read on.