W9128F-27-R-A045
AASF Mather Fueling System Repairs
- PROPOSAL INSTRUCTIONS,
SUBMISSION REQUIREMENTS AND EVALUATION
1.
WHO MAY SUBMIT
This solicitation is restricted to the Contractors under Small Business Set-Aside, Solicitation W9128F-27-R-A045. 2.
GENERAL REQUIREMENTS
In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information sufficiently detailed to clearly indicate compliance with the proposal submission requirements. 3.
SUBMISSION DEADLINE
Proposals shall be received by the USACE Contracting Activity no later than the time and date specified in Block 13 of Standard Form 1442. Proposals shall be submitted electronically to the Contract Specialist per the instructions included in the RFP letter.
4.
SUBMITTAL REQUIREMENTS
8.5 inch x 11 inch page size; font no smaller than 10 size. The requirements specified in the solicitation are considered minimum requirements. A proposal that fails to comply with the minimum technical requirements will not be eligible for award.
SUBMITTAL REQUIREMENTS
Para. 4.1 - Project Experience Example (Volume 1)
Factor 1: Offeror’s Project Experience
Factor 2: Project Schedule
Para. 4.2 – Pricing (Volume 2)
a) Section 00 10 00, SF1442 Solicitation/Contract Form and Pricing Schedule
PLEASE BE SURE THAT YOUR TECHNICAL PROPOSAL AND PRICING ARE SUBMITTED IN A
SEVERABLE FORM SUCH AS SEPARATE FILES.
4.1 FACTOR 1: PROJECT EXPERIENCE EXAMPLES:
a. Offeror shall submit three (3) projects, each of which included following activities:
1. Fuel dispenser repairs
2. Small building demolition, construction, or repairs
3. Fuel tank appurtenance replacement or installation
4. Remote containment construction or other similar work Projects that do not include each of these activities are unacceptable as project experience examples. b. Project total cost, at completion, must total $1,000,000.00 or greater for each project. Projects below this threshold are unacceptable as project experience examples. c. Projects shall have been completed within the past ten years (calculated from the date of this RFP). Projects completed more than ten years ago are unacceptable as project experience examples. d. Projects submitted as evidence of required experience shall be accompanied by a Customer evaluation (CPARS/PPIPR/PPQ, etc.), signed by the Customer, which states that Offeror’s performance on the project was Satisfactory (or equivalent) or better. Projects that do not include this are unacceptable as project experience