REQUEST FOR PROPOSAL (RFP)

DIVISION 01 SPECIFICATIONS

Design-Build Scope of Work
Solicitation No. W9128F-27-R-A045

Fueling System Repairs
Project No.*

Mather AASF, California
October 2026

* - A complete Defense Logistics Agency project number will be provided after award.

This page was intentionally left blank for duplex printing.

SPECIFICATIONS FOR DESIGN AND CONSTRUCTION

OF

FUELING SYSTEM REPAIRS AT

MATHER ARMY AVIATION SUPPORT FACILITY (AASF), CALIFORNIA

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 30 00.24

OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS

PROJSIGN

PROJECT SIGN DETAILS

01 32 01.00 10

PROJECT SCHEDULE

01 33 00

SUBMITTAL PROCEDURES

REGISTER

SUBMITTAL REGISTER

01 33 00.32

DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES

Attachment A

DESIGN CERTIFICATION AND TRANSMITTAL LETTER

Attachment B

SUPPLEMENTAL DESIGN CERTIFICATION AND TRANSMITTAL FORM

Attachment C

SUBMITTAL PARAGRAPH REQUIREMENTS

Attachment D

TECHNICAL SCOPE OF WORK

Attachment E
RFP DRAWINGS (provided under separate cover)
Attachment F
POINTS OF CONTACT INFORMATION (provided after contract award) Attachment G

DEFENSE LOGISTICS AGENCY (DLA) MEMORANDUM

01 33 29

SUSTAINABILITY REPORTING

01 35 26

GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00

QUALITY CONTROL

01 45 00.15 10

RESIDENTIAL MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 74 19

CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 36.00 24

WARRANTY OF CONSTRUCTION AND DESIGN

01 78 39.00 24

AS-BUILT DRAWINGS

01 78 39.00 24AT MODIFICATIONS AND TITLE BLOCK EXAMPLES

-- End of Project Table of Contents --

00 01 00 - 1

PROJECT TABLE OF CONTENTS

This page was intentionally left blank for duplex printing.

Fueling System Repairs - Mather AASF, California

MTCA00100

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 30 00.24

OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS

PART 1

GENERAL

1.1
1.2
1.3
1.4

REFERENCES

EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

DESIGN-BUILD CONSTRUCTION CONTRACTS (MAR 2019)

CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING

CONSTRUCTION WAGE RATE REQUIREMENTS STATUTE CERTIFIED LABOR

PAYROLLS

1.5

VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

1.6

SEQUENCE OF DESIGN CONSTRUCTION

1.7

CONTRACTOR PERFORMANCE EVALUATIONS

1.8

REQUEST FOR PROPOSAL (RFP) DRAWINGS

1.9

SUBMITTALS

1.10

CONCURRENT CONSTRUCTION

1.11

PAYMENT

1.11.1

PROMPT PAYMENT ACT

1.11.2

PAYMENT FOR MATERIALS STORED OFFSITE

1.12

AVAILABILITY OF UTILITY SERVICES

1.12.1
Utility Meters (for temporary connections)
1.12.2
Backflow Preventers
1.12.2.1