STATEMENT OF WORK
TSV4 NARRAGANSETT HABITABILITY DRAWING PACKAGE AND BILL OF
MATERIAL DEVELOPMENT
1. OBJECTIVE
The Contractor shall develop a drawing package and Bill of Materials (BOM) to support habitability upgrades to the messing, berthing, stateroom, and sanitary spaces aboard TSV4 Narragansett, located at Joint Expeditionary Base Little Creek–Fort Story, Pier 1, Virginia Beach, Virginia.
This requirement does not include procurement, fabrication, removal, installation, or modification of shipboard furniture, equipment, piping, electrical systems, or other shipboard components. This requirement is limited to assessment, drawing-package development, and BOM development.
2. SCOPE:
2.1 The Contractor shall use the mandatory ship check, Government-furnished drawings, applicable technical manuals, and available technical history to verify existing shipboard conditions and develop the required drawing package. The Contractor shall identify discrepancies between available reference drawings and actual shipboard conditions when observed during the ship check or development of the drawing package.
2.2 Drawing Package Requirements
The Contractor shall develop vessel wide drawings for galley, messing, and berthing of each stateroom, and associated sanitary space aboard the Narragansett. The package shall:
2.2.1 Be based on actual shipboard conditions verified during the ship check. 2.2.2 Be prepared in F-size NAVSEA format.
2.2.3 Depict the arrangement, location, and configuration of applicable furniture, fixtures, appliances, and equipment.
2.2.3.1 Including: berth, locker, desk, wardrobe, armchair, recliner, lounge chair, sofa, locker, shower and shower door, mess table, chair, bread toaster, coffee maker, refrigerator, griddle, range with oven, vent exhaust hood, refrigerator/freezer, food waste disposal, counter with and without cabinet, counter with shelves & drawers, condiment shelf, fountain juice machine, and sink showing system layout, location, equipment location each component detail, as applicable.
2.2.4 Include sufficient details to support Government planning for habitability upgrades.
2.2.5 Incorporate Government comments provided during draft review.
2.3 Bill of Materials
The Contractor shall provide a BOM supporting the drawing package. The BOM shall identify, at a minimum, the following information for each item, as applicable:
2.3.1 Item Description
2.3.2
2.3.3
2.3.4
2.3.5
2.3.6
2.3.7
2.3.8
Quantity
Proposed location aboard the vessel
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Site Visit Template 1
- Solicitation
- 5B - Electric Plant Installation Standard Methods for Surface Ships and Submarines
- Schedule of Piping Valves Fittings and Associated
- Chapter 505 Piping Systems
- General Specifications for Overhaul of Surface Ships
- Questions and Answers
- Solicitation Amendment - Conformed Copy
- Questions and Answers LM
- Questions and Answers 2