Subject:
ND NP THRO 204(1) Buck Hill Road –
Final Hydraulics Report Parking Lot Inlet
Date: March 2025
To:
Toni Pankau, Project Manager, CFLHD
Wilmari Valentín, Highway Design, CFLHD
From:
Luis Calderón, PE, Lead Hydraulic Engineer, CFLHD
Digitally signed by LUIS GERARDO
CALDERON
Date: 2025.03.18 09:09:26 -06'00'
LUIS GERARDO CALDERON
Summary
The purpose of this addendum is to update the proposed inlet recommendation (Identifier PR05) for the Buck Hill Parking Lot reconstruction. Further hydraulic analysis of the site has determined that an NDDOT Inlet Type 2 – Double, with an approximate grate length of 6 feet, is adequate to collect runoff from the parking lot. Initially, this inlet was sized to handle runoff from a 50-year design storm. However, per FLH PDDM Section 7.3.3.2.1, parking areas can be designed for a 10-year design storm. Additionally, the clogging factor was originally set at 50% based on PDDM 7.3.3.3.3 guidance for grate inlets. Since the proposed inlet is a combination curb-grate type a clogging factor is not assumed unless it is a documented problem. For this revision, both 0% and 50% clogging factors are considered, as outlined below. The inlet details are shown on Sheet T7 of the plans and specify the use of the double casting option. Table 1 below provides the updated recommendations, including results for both the 10-year and 50-year design storms.
Table 1: Revised Inlet Recommendations
Identifier
Inlet Type
Minimum
Grate Length
(Ft)
PR05
NDDOT Type 2
double
Design
Storm
Peak Flow
(cfs)
10-year
50-Year
5.9
7.5
Flow Depth at
Grate
(50% clogging)
(in)
0.54
0.63
Flow Depth at
Grate
(0% Clogging)
(in)
0.34
0.39
Figure 1: Inlet Design 10-Year No Clogging
Figure 2: Inlet Design 10-Year 50% Clogging
Figure 3: Inlet Design 50-Year No Clogging
Figure 4: Inlet Design 50-Year 50% Clogging
The beginning of the document. Download the full file to read on.
Other documents in this bid
- ND thro204 Buck Hill Road Hyd Report
- Invitation for Bids ND NP THRO 204 Buck Hill Road
- Eng
- ND NP THRO 204 - Justification for Other Than Full and Open Competition
- ND NP THRO 204 Buck Hill Road Pavement Memo
- THRO 204 Buck Hill Road Geotechnical Report Full Signed
- XS 100 Percent THRO 204
- Questions and Answers 10 07 2026 ND NP THRO 202 Buck Hill Road
- Questions and Answers 10 14 2026 ND NP THRO 202 Buck Hill Road