Buck Hill Road
ND NP THRO 204(1)
Final Hydraulics Report
In Partnership With:
Theodore Roosevelt National Park
National Park Service
Federal Highway Administration
Central Federal Lands Highway Division
February 2025
Signature Sheet
Digitally signed by MARY
Report prepared by:
Report reviewed by:
MARY KATHLEEN KATHLEEN KELEHAN
Date: 2025.02.19 15:40:29
KELEHAN
-07'00'
Katie Kelehan, Hydraulic Engineer
Digitally signed by AARON ESTEP, PE
AARON
ESTEP,
PE
Date: 2025.02.19 16:13:14 -07'00'
Aaron Estep, Hydraulic Engineer
Digitally signed by LUIS GERARDO
LUIS GERARDO
CALDERON
Date: 2025.02.19 18:17:56 -07'00'
Approved for distribution by: CALDERON
Luis Calderón, Lead Hydraulic Engineer
Distribution
Electronic: N:\ND\thro204(01)\Hydraulics\9_Final‐Report Toni Pankau, Project Management
Stacy Dicciccio, Lead Designer
Wilmari Valentin‐Medina, Designer
Catherine Henry, Environment
Dominic Monarco, Geotech
Ron Andresen, Pavements
Vaughn Marshall, Construction
ND NP THRO 204(1) Buck Hill Road – Final Hydraulics Report
Executive Summary
Project Description:
Hydrologic and hydraulic analyses were conducted for the ND NP THRO 204(1) Buck Hill Road project located in Billings County, North Dakota. Buck Hill Trail Road, also known as Route 204, is in the Southeast portion of the South Unit of Theodore Roosevelt National Park. The route begins at the intersection of Buck Hill Trail Road and Scenic Loop Road. The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The Buck Hill Overlook is a very popular location in the park, with approximately 32% of the park visitors visiting this overlook. This project proposes to rehabilitate the existing pavement, address subsurface issues observed along the route (including a previously identified slide area), and reconstruct the Buck Hill Overlook parking area at the end of the route. Along the project route, 8 existing culverts are slated for replacement or removal. An active landslide exists from approximate station 113+00 to station 122+50. Ditch reconditioning and additional inlets are recommended to reduce standing water at the base of this slide.
Design Criteria:
The Federal Lands Highway Project Development and Design Manual (PDDM) establishes the hydraulic design criteria for Buck Hill Road. With an average daily traffic (ADT) of 150 vehicles and a design speed of 15 mph, Buck
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Invitation for Bids ND NP THRO 204 Buck Hill Road
- Eng
- ND NP THRO 204 - Justification for Other Than Full and Open Competition
- ND NP THRO 204 Buck Hill Road Pavement Memo
- ND NP THRO 204 Hydraulics Report Addendum
- THRO 204 Buck Hill Road Geotechnical Report Full Signed
- XS 100 Percent THRO 204
- Questions and Answers 10 07 2026 ND NP THRO 202 Buck Hill Road
- Questions and Answers 10 14 2026 ND NP THRO 202 Buck Hill Road