BRIDGE INSPECTION REPORT
FALL KILL BRIDGE
ENTRANCE ROAD OVER FALL KILL
ELEANOR ROOSEVELT NATIONAL HISTORIC SITE
APPROACH LOOKING EAST
STRUCTURE NO. 1793-001P
INSPECTION TYPE: -ROUTINEINSPECTION DATE: 7/22/2024
Report prepared by:
Federal Highway Administration
NORTH (UPSTREAM) SIDE
FLH Office of Bridges and Structures
Bridge Inspection Program
22001 Loudoun County Parkway, Building E2, Suite 200
Ashburn, VA 20147
https://bridge.flhd.fhwa.dot.gov
STRUCTURE NO.
INSPECTION DATE:
STRUCTURE SUMMARY
FALL KILL BRIDGE
1793-001P
07/22/2024
BRIDGE IDENTIFICATION AND DESCRIPTION
# OF BEAMS, MAIN SPAN: . 10
ABUTMENT / PIER MAT'L: .. 1 - CONCRETE
STRUCT. TOTAL LENGTH: . 40.0 FT (12.2 M)
YEAR RECONSTRUCTED: . 1984
INSTALLED, TIMBER RAILING REPLACED UNDER PRA-VAMA 12(2), 2013 - MASONRY
REPAIRS UNDER PRA-ELRO 10(2).
LOCATION
ELEANOR ROOSEVELT NATIONAL HISTORIC SITE
FEATURE INTERSECTED: FALL KILL
INSPECTION TEAM:
MILE POINT: .. 0 (KM PT 0)
M. Kreider, J. Voight
CONDITION ASSESSMENT:
Micheal Kreider
REPORT REVIEW:
Marcus Miller
REPORT APPROVAL:
Date: 03/17/2025
Jorgomai Ceesay
STRUCTURE EVALUATION SUMMARY
This timber beam bridge is in fair condition overall. The structure currently exhibits minor deterioration along the waterline of the east abutment, exposed footing at the east abutment, and minor deterioration of the timber deck, curbs, and railings. These conditions will continue to be monitored during future inspection cycles. The south railing at the east approach was replaced since the last inspection. Corrective measures for other issues should be taken as outlined in this report to help improve visitor safety. Consideration should also be given to replacing the existing bridge railing system with one meeting current safety standards.
It should also be noted that the bridge is currently posted for a 10-ton load limit. Please be advised that the calculated capacity of the bridge is adequate for legal loads and posting for load is no longer required. However, the existing load limit signs may remain in place at the discretion of the Park.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO.
1793-001P
FALL KILL BRIDGE
07/22/2024
INSPECTION DATE :
C
PRIORITY OF IMPROVEMENT
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger. B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections. C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.