BRIDGE INSPECTION REPORT

FALL KILL BRIDGE

ENTRANCE ROAD OVER FALL KILL

ELEANOR ROOSEVELT NATIONAL HISTORIC SITE

APPROACH LOOKING EAST

STRUCTURE NO. 1793-001P

INSPECTION TYPE: -ROUTINEINSPECTION DATE: 7/22/2024

Report prepared by:
Federal Highway Administration

NORTH (UPSTREAM) SIDE

FLH Office of Bridges and Structures
Bridge Inspection Program
22001 Loudoun County Parkway, Building E2, Suite 200
Ashburn, VA 20147
https://bridge.flhd.fhwa.dot.gov

STRUCTURE NO.

INSPECTION DATE:

STRUCTURE SUMMARY

FALL KILL BRIDGE

1793-001P
07/22/2024

BRIDGE IDENTIFICATION AND DESCRIPTION

# OF BEAMS, MAIN SPAN: . 10

ABUTMENT / PIER MAT'L: .. 1 - CONCRETE

STRUCT. TOTAL LENGTH: . 40.0 FT (12.2 M)

YEAR RECONSTRUCTED: . 1984

INSTALLED, TIMBER RAILING REPLACED UNDER PRA-VAMA 12(2), 2013 - MASONRY

REPAIRS UNDER PRA-ELRO 10(2).

LOCATION

ELEANOR ROOSEVELT NATIONAL HISTORIC SITE

FEATURE INTERSECTED: FALL KILL

INSPECTION TEAM:

MILE POINT: .. 0 (KM PT 0)

M. Kreider, J. Voight

CONDITION ASSESSMENT:

Micheal Kreider

REPORT REVIEW:

Marcus Miller

REPORT APPROVAL:

Date: 03/17/2025

Jorgomai Ceesay

STRUCTURE EVALUATION SUMMARY

This timber beam bridge is in fair condition overall. The structure currently exhibits minor deterioration along the waterline of the east abutment, exposed footing at the east abutment, and minor deterioration of the timber deck, curbs, and railings. These conditions will continue to be monitored during future inspection cycles. The south railing at the east approach was replaced since the last inspection. Corrective measures for other issues should be taken as outlined in this report to help improve visitor safety. Consideration should also be given to replacing the existing bridge railing system with one meeting current safety standards.
It should also be noted that the bridge is currently posted for a 10-ton load limit. Please be advised that the calculated capacity of the bridge is adequate for legal loads and posting for load is no longer required. However, the existing load limit signs may remain in place at the discretion of the Park.

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO.

1793-001P

FALL KILL BRIDGE

07/22/2024

INSPECTION DATE :

C

PRIORITY OF IMPROVEMENT

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger. B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections. C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.