WORK ORDER NO. 1812040
SPECIFICATIONS
100% FINAL SUBMISSION JULY 2026
P-1016 Consolidated RDTE Systems Facility
At
Naval Undersea Warfare Center (NUWC), Newport, RI
SUBMITTED BY:
Colby Company Engineering
47A York Street
Portland, ME 04101
A/E Contract Number: N40085-22-D-0003
Architectural:
Structural:
Civil:
Mechanical:
Electrical:
Fire Protection:
Interior Design:
Landscape Architect:
PREPARED BY:
Elizabeth Coronado, NCARB, AIA, Colby Company Engineering David Sheldrake, P.E., Colby Company Engineering
David Manzo, P.E., Colby Company Engineering
David Brown, P.E., Colby Company Engineering
Bruce Goodwin, Colby Company Engineering
Shannon Rice, P.E., Colby Company Engineering
Lynn Pepin, CWS Architects
Barry J. Hosmer, Landscape Architect
For Commander, NAVFAC Mid-Atlantic
APPROVED BY:
James E. Donahue, R.A.
NUWC P-1016
NEWPORT NAVAL STATION, NEWPORT, RI
100% FINAL SPECIFICATIONS
JULY 2026
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15
LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00
01 14 00
01 20 00
01 30 00
01 30 02.00 22
11/22, CHG 1: 02/23
11/20, CHG 3: 02/23
11/20, CHG 3: 08/23
01 31 23.13 20
08/23, CHG 1: 02/24
01 32 17.00 20
01 33 00
01 33 29
08/18, CHG 4: 02/21
01 35 26
01 42 00
01 45 00
01 45 35
01 50 00
11/20, CHG 4: 08/23
11/20, CHG 2: 08/22
01 57 19
01 58 00
01 74 19
08/19, CHG 5: 08/22
02/19, CHG 3: 11/21
01 78 00
01 78 23
01 78 24.00 20
01 91 00.15 22
01 91 19
05/19, CHG 1: 08/21
05/23, CHG 1: 11/23
05/2023
SUMMARY OF WORK
WORK RESTRICTIONS
PRICE AND PAYMENT PROCEDURES
ADMINISTRATIVE REQUIREMENTS
DESIGN, PROCUREMENT, AND INSTALLATION
OF AUDIOVISUAL EQUIPMENT
ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
SUBMITTAL PROCEDURES
SUSTAINABILITY REQUIREMENTS AND
REPORTING
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
SPECIAL INSPECTIONS
TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
PROJECT IDENTIFICATION
CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
FACILITY DATA WORKBOOK (FDW)
TOTAL BUILDING COMMISSIONING
BUILDING ENCLOSURE COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00
02 82 00
02 83 00
02 84 16
11/18, CHG 1: 11/19
DEMOLITION
ASBESTOS REMEDIATION
LEAD REMEDIATION
HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
DIVISION 03 - CONCRETE
03 30 00
02/19, CHG 8: 05/24 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment C- Construction Experience Project Data
- Attachment D- Past Performance Questionnaire
- Attachment E- Historical Small Business Utilization
- Attachment F-Small Business Participation Commitment
- Attachment G - Individual SB Subcontracting Plan
- Attachment H -Price Proposal Form
- Attachment I - SECNAV FORM 5512
- Attachment J - Wage Determination
- NUWC P084 - Specifications
- Solicitation
- Amendment 1
- Amendment 3