Home / P084 Next Generation Torpedo Integration Lab, Naval Station… / Document

NUWC P084 - Specifications

Updated

A PDF document (14.2 MB) attached to P084 Next Generation Torpedo Integration Lab, Naval Station Newport, Newport RI, from the Department of the Navy. Due Nov 10, 2026, 2:00 PM (UTC-5).

File name: NUWC P084 - Specifications.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

WORK ORDER NO. 1812043

SPECIFICATIONS

100% FINAL SUBMISSION MAY 2026

P-084 Next Generation Torpedo Integration Lab
At

Naval Undersea Warfare Center (NUWC), Newport, RI

SUBMITTED BY:

Colby Company Engineering
47A York Street
Portland, ME 04101
A/E Contract Number: N40085-22-D-0003

Architectural:
Structural:
Civil:
Mechanical:
Electrical:
Fire Protection:
Interior Design:
Landscape Architect:

PREPARED BY:

Dan Ellingson, RA, Colby Company Engineering
David Sheldrake, P.E., Colby Company Engineering
David Manzo, P.E., Colby Company Engineering
Rich McCauley, P.E., Colby Company Engineering
Jason Beaulieu, P.E., Colby Company Engineering
Shannon Rice, P.E., Colby Company Engineering
Lynn Pepin, CWS Architects
Barry J. Hosmer, Landscape Architect

APPROVED BY:

For Commander, NAVFAC Mid-Atlantic
James E. Donahue, R.A.
Date: 06/09/2026

NUWC P-084

NEWPORT NAVAL STATION, NEWPORT, RI

100% FINAL SPECIFICATIONS

MAY 2026

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15

LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00

01 14 00

01 20 00

01 30 00

01 30 02.00 22

11/22, CHG 1: 02/23
11/20, CHG 3: 02/23
11/20, CHG 3: 08/23

01 31 23.13 20

08/23, CHG 1: 02/24

01 32 17.00 20

01 33 00

01 33 29

08/18, CHG 4: 02/21

01 35 26

01 42 00

01 45 00

01 45 35

01 50 00

11/20, CHG 4: 08/23
11/20, CHG 2: 08/22

01 57 19

01 58 00

01 74 19

08/19, CHG 5: 08/22
02/19, CHG 3: 11/21

01 78 00

01 78 23

01 78 24.00 20

01 78 30.00 22

01 91 00.15 22

01 91 19.00 22

05/19, CHG 1: 08/21
05/23, CHG 1: 11/23

SUMMARY OF WORK

WORK RESTRICTIONS

PRICE AND PAYMENT PROCEDURES

ADMINISTRATIVE REQUIREMENTS

DESIGN, PROCUREMENT, AND INSTALLATION

OF AUDIOVISUAL EQUIPMENT

ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

(eCMS)

COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

SUBMITTAL PROCEDURES

SUSTAINABILITY REQUIREMENTS AND

REPORTING

GOVERNMENTAL SAFETY REQUIREMENTS

SOURCES FOR REFERENCE PUBLICATIONS

QUALITY CONTROL

SPECIAL INSPECTIONS

TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

TEMPORARY ENVIRONMENTAL CONTROLS

PROJECT IDENTIFICATION

CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

CLOSEOUT SUBMITTALS

OPERATION AND MAINTENANCE DATA

FACILITY DATA WORKBOOK (FDW)

GIS DATA DELIVERABLES

TOTAL BUILDING COMMISSIONING

BUILDING ENCLOSURE COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00

DEMOLITION AND DECONSTRUCTION

DIVISION 03 - CONCRETE

03 30 00

02/19, CHG 8: 05/24 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00

11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

The beginning of the document. Download the full file to read on.

Other documents in this bid