NUWC P084 - Specifications
Updated
A PDF document (14.2 MB) attached to P084 Next Generation Torpedo Integration Lab, Naval Station Newport, Newport RI, from the Department of the Navy. Due Nov 10, 2026, 2:00 PM (UTC-5).
File name: NUWC P084 - Specifications.pdf
The full file is for paid members, or buy this bid alone.
Preview
WORK ORDER NO. 1812043
SPECIFICATIONS
100% FINAL SUBMISSION MAY 2026
P-084 Next Generation Torpedo Integration Lab
At
Naval Undersea Warfare Center (NUWC), Newport, RI
SUBMITTED BY:
Colby Company Engineering
47A York Street
Portland, ME 04101
A/E Contract Number: N40085-22-D-0003
Architectural:
Structural:
Civil:
Mechanical:
Electrical:
Fire Protection:
Interior Design:
Landscape Architect:
PREPARED BY:
Dan Ellingson, RA, Colby Company Engineering
David Sheldrake, P.E., Colby Company Engineering
David Manzo, P.E., Colby Company Engineering
Rich McCauley, P.E., Colby Company Engineering
Jason Beaulieu, P.E., Colby Company Engineering
Shannon Rice, P.E., Colby Company Engineering
Lynn Pepin, CWS Architects
Barry J. Hosmer, Landscape Architect
APPROVED BY:
For Commander, NAVFAC Mid-Atlantic
James E. Donahue, R.A.
Date: 06/09/2026
NUWC P-084
NEWPORT NAVAL STATION, NEWPORT, RI
100% FINAL SPECIFICATIONS
MAY 2026
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15
LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00
01 14 00
01 20 00
01 30 00
01 30 02.00 22
11/22, CHG 1: 02/23
11/20, CHG 3: 02/23
11/20, CHG 3: 08/23
01 31 23.13 20
08/23, CHG 1: 02/24
01 32 17.00 20
01 33 00
01 33 29
08/18, CHG 4: 02/21
01 35 26
01 42 00
01 45 00
01 45 35
01 50 00
11/20, CHG 4: 08/23
11/20, CHG 2: 08/22
01 57 19
01 58 00
01 74 19
08/19, CHG 5: 08/22
02/19, CHG 3: 11/21
01 78 00
01 78 23
01 78 24.00 20
01 78 30.00 22
01 91 00.15 22
01 91 19.00 22
05/19, CHG 1: 08/21
05/23, CHG 1: 11/23
SUMMARY OF WORK
WORK RESTRICTIONS
PRICE AND PAYMENT PROCEDURES
ADMINISTRATIVE REQUIREMENTS
DESIGN, PROCUREMENT, AND INSTALLATION
OF AUDIOVISUAL EQUIPMENT
ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
SUBMITTAL PROCEDURES
SUSTAINABILITY REQUIREMENTS AND
REPORTING
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
SPECIAL INSPECTIONS
TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
PROJECT IDENTIFICATION
CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
FACILITY DATA WORKBOOK (FDW)
GIS DATA DELIVERABLES
TOTAL BUILDING COMMISSIONING
BUILDING ENCLOSURE COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00
DEMOLITION AND DECONSTRUCTION
DIVISION 03 - CONCRETE
03 30 00
02/19, CHG 8: 05/24 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00
11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment C- Construction Experience Project Data
- Attachment D- Past Performance Questionnaire
- Attachment E- Historical Small Business Utilization
- Attachment F-Small Business Participation Commitment
- Attachment G - Individual SB Subcontracting Plan
- Attachment H -Price Proposal Form
- Attachment I - SECNAV FORM 5512
- Attachment J - Wage Determination
- NUWC P-1016 - Specifications
- Solicitation
- Amendment 1
- Amendment 3